An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plant in Saudi Arabia Case story for Nose Ring Castables D52A

  2. XX Cement Company Case story for Nose Ring – Castables D52A By The Production Chief, from the plant in Kingdom of Saudi Arabia And Kurt Christensen, Director AL-CEM Aps Bahrain

  3. Case story for Nose Ring – Castables D52A

  4. Case story for Nose Ring – Castables D52A Problem: In year 2008 the plant was having a problem with the castables used in the Nose Ring in the Kiln. They used to stop the kiln after less than 6 months for repairing the nose ring and it was a big issue for the plant.

  5. Case story for Nose Ring – Castables D52A Test of HASLE Refractories Castables D52A: The plant tested D52A in the nose ring, which was installed by the supervisor Mr. Bent Ole Lindahl, HASLE Refractories.

  6. The plant - Case story for Nose Ring – Castables D52A Installation on site .

  7. The plant - Case story for Nose Ring – Castables D52A Installation on site .

  8. The plant - Case story for Nose Ring – Castables D52A Installation on site .

  9. The plant - Case story for Nose Ring – Castables D52A Installation on site .

  10. The plant Case story for Nose Ring – Castables D52A Results: By using HASLE Refractories D52A the plant was increasing the life of the nose ring to: 1 year. The result means: longer operation between the shut down.

  11. The plant Case story for Nose Ring – Castables D52A From: Mr. XXSent: 6. oktober 2011 1:50To: AL-CEM Bahrain; Lindhal Bentole HasleSubject: FW: Kiln Nose Ring Photograph Dear Mr. Kurt,                     I am sending you a photograph of Kiln Nose Ring condition which was installed in second week of January,2011 and photograph was made in recent  shut down in September,2011. This time we have taken annual shutdown earlier in September which was scheduled in January,2012 due to some other reason. We replaced brick lining in burning and transition zone but had minor repair of Nose Ring Castable. We did not go for its replacement due to excellent condition of castable and to avoid prolonged shutdown. Thickness of Castable was as good as new casted except few corners had worne out which were repaired by chipping,anchoring, fixing proper steel shuttering and pouring Hasle D52 Castable. We expect life time upto minimum 18 months and we shall try upto 24 months so that it should be replaced during next annual shutdown.This will help you in presentingcompanyXX case study in Bangkok Seminar.Best RegardsMr. XXManager ProductionThe plant

  12. Case story for Nose Ring – Castables D52A

  13. Case story for Nose Ring – Castables D52A • After this good experience the plant has decided to continue to use the castable from HASLE Refractories. • Recently they made contract with HASLE Refractories to use the castable for: • The kiln hood • Grate cooler • The Bull nose. • The local Contractor for installation is KARRENA as arranged by AL-CEM APS.

  14. Case story for Nose Ring – Castables D52A

  15. Case story for Nose Ring – Castables D52A The company is a Saudi joint stock company which was established in 2005 and being headed by H.R.H. Prince Faisal Bin Abdul Majeed Bin Abdul Aziz Al-Saud (Chairman of The Board). The company began the first production line in July, 2007 with a nominal capacity of 5,000 tons per day. Due to increasing demand in the domestic market and neighboring countries, the board had decided the establishment of the second-line with the same capacity which has been come into stream in April, 2010, while both lines have an in-built capacity of 11,000 tons/day.

  16. The plant - Nose Ring – HASLE Castables D52A • CountryKingdom of Saudi Arabia • Industry Cement • Plant group name:                               The plant • Plant name:                                         XX • Main equipment supplier:                 Sinoma, China • Production capacity / line - design:5000 TPD • Number of production lines:                2 • Run factor                                            0,93 • Fuel Types Gas • First line started in year 2007 • Second line started in Year 2010

  17. Case story for Nose Ring – Castables D52A Chemical and physical specification of the cement type: Ordinary Portland cement (OPC-I) as per SASO 143 specifications 2. Ordinary Portland cement (OPC-II) as per ASTM-C150 specifications 3. Sulphate Portland cement (SRC) as per SASO 570 / 1994 specifications

  18. Case story for Nose Ring – Castables D52A Conclusion. By using HASLE Refractories D52A for the Nose ring: The operation time has been increased: From 6 month to more than 12 month. RCC is expecting + 18 month.

  19. The plant - Case story for Nose Ring – Castables D52A Installation on site A happy Production Manager: .