370 likes | 673 Views
12 th ANTAH GROUP CONFERENCE 11 th - 14 th AUGUST 2005 Guoman Hotel, PortDickson Negeri Sembilan. PRIVATISATION OF LEBUHRAYA KAJANG - SEREMBAN. Project Information. Project Information. PRIVATISATION OF LEBUHRAYA KAJANG SEREMBAN (KASEH)
E N D
12th ANTAH GROUP CONFERENCE 11th- 14th AUGUST 2005 Guoman Hotel, PortDickson Negeri Sembilan PRIVATISATION OF LEBUHRAYA KAJANG - SEREMBAN
PRIVATISATION OF LEBUHRAYA KAJANG SEREMBAN (KASEH) Relationship Between Various Parties With Respect of the Works Government KASEH Lenders reporting reporting Independent Consulting Engineer (ICE) Khairi Consult reporting reporting IJM (Turnkey Contractor) monitoring Design & Consultant (SC) HSS Integrated Arkitek M&L Perunding Eagles information MHA Contractual Relationship Functional Responsibility
Highway Information SECTION Section 1Section 2Section 3 TOTAL SUB-SECTION1A1B 2A2B - SECTIONALLIMITS LOCATION LENGTH (Km) INTERCHANGES TOLL PLAZAS REST & SERVICES AREAS CH32700 To CH44275 CH 0.00 to Kajang Selatan Interchange CH18200 To CH26000 CH26000 To CH32700 Kajang Selatan Interchange to CH 18200 CH 0.00 to Kajang Selatan I/C Kajang Selatan I/C to South of Pajam I/C South of Pajam I/C To south of Mantin I/C South of Mantin I/C to south of Setul I/C South of Setul I/C To Paroi (partial Grade Separated Junction) 1.44 16.76 7.80 6.70 11.575 44.275 3 nos 2 nos 1 nos + Partial Grade Separated Junction 7 3 nos 2 nos 1 nos 6 2 nos 2 - - Note: Section 1A has been completed
Legend: KAJANG BYPASS KASEH Highway Proposed Realignment of Mantin-Setul Road Revised Alignment between Jelebu to Panchor as approved by UPEN KAJANG BEROGA KAJANG SELATAN INTERCHANGE Sg. Semenyih 1 B34 SEMENYIH Sg. Rinching SEMENYIH INTERCHANGE S E L A N G O R N E G E R I S E M B I L A N BERANANG Sg. Beranang B18 N34 Alignment as per Concession Agreement PANTAI BANGI KAJANG – SEREMBAN HIGHWAY Revised Alignment between Jelebu to Panchor as approved by UPEN 86 BANGI INTERCHANGE MANTIN Sg. Langat PAJAM 1 N36 Proposed Nilai - Pajam Link Road JELEBU INTERCHANGE MANTIN INTERCHANGE PAJAM INTERCHANGE N38 KLIA INTERCHANGE PAROI INTERCHANGE Proposed Realignment of Mantin-Setul Road N28 SETUL INTERCHANGE 86 NEW NILAI INTERCHANGE 51 Lebuhraya ELITE S E R E M B A N NILAI INTERCHANGE Proposed Senawang – Paroi Link Road 1 97 NILAI N NORTH-SOUTH HIGHWAY 1 N24 KTM RAILWAY TRACK SEREMBAN (N) INTERCHANGE SENAWANG INTERCHANGE N38 PORT DICKSON INTERCHANGE PRIVATISATION OF LEBUHRAYA KAJANG SEREMBAN
Tolling Concept B18 N36 FR1 FR1 Kajang Selatan I/C FR51 FR86 Toll Plaza Toll Plaza Toll Plaza Kajang Selatan Toll Plaza Setul Toll Plaza Jelebu Toll Plaza , Pajam Interchange Mantin Interchange Setul Interchange Paroi Interchange Jelebu Interchange Semenyih Interchange FR 1 Section 1 Section 2 Section 3
Supplemental Concession Agreement (SCA) CHANGES TO THE CONCESSION AGREEMENT In principle the Steering Committee for Privatisation have agreed to forward the following changes to be part of the Supplemental Concession Agreement. 1 To adopt PLUS’s Toll Rates approved in 2002. 2 To extend to Concession Period by seven years ending 2037. 3 To extend the construction period to first quarter of 2007. 4 To reschedule the payment for the reimbursable land cost after all commercial borrowings had been fully paid. 5 To accept and adopt the realignment proposal for Package 2B (Mantin to Setul). 6 To allow for Sectional Tolling on completed sections.
Status of Land Acquisition • PACKAGE 1A - FULL POSSESSION OF SITE OBTAINED • PACKAGE 1B - FULL POSSESSION OF SITE OBTAINED • PACKAGE 2A - FULL POSSESSION OF SITE OBTAINED • PACKAGE 2B - MANTIN – SETUL (PENDING FINALISATION OF REALIGNMENT) • PACKAGE 3 - LAND ACQUISTION 100% COMPLETED
Progress Photograph Location : CH 0+800 FR 1 (Kajang Selatan Interchange) Description : Pavement works in progress
Progress Photograph Location : Bridge No. 1 (Kajang Selatan Interchange) Description : Maintain Load Test for 500mm dia spun pile
Progress Photograph Location : Bridge No. 1 Description : Rebar fixing for I-18 beam
Progress Photograph Location : CH 3+300 (Mainline – Kajang Selatan Toll Plaza Area) Description : Earthworks in progress
Progress Photograph Location : CH 3+500 (Mainline - Kajang Selatan Toll Plaza Area) Description : Earthworks in progress
Progress Photograph Location : CH 0+525 (Semenyih Interchange) Description : Bridge over Mainline
Progress Photograph Location : CH 1500 – Slip Road 2B (Semenyih Interchange) Description : Earthworks in progress.
Progress Photograph Location : Semenyih Toll Plaza Area Description : Installation of Rebar for DBC No. S-4
Progress Photograph Location : CH 5+900 Description : Preparation of formation
Progress Photograph Location : CH 6+600 (Mainline) Description : Preparation of formation
Progress Photograph Location : Bridge No.3 (B18) Description : Location of Mainline Bridge at Semenyih-Bangi road (B18)
Progress Photograph Location : Bridge No. 4 - Sg. Semenyih Description : I-18 Beam casting in progress
Progress Photograph Location : Bridge No. 4 - Sg. Semenyih Description : Preparation of formation (view looking northbound)
Progress Photograph Location : CH 8+300 (Mainline) Description : Preparation of formation (view looking northbound)
Progress Photograph Location : CH 10+850 (Mainline) Description : Earthworks in progress
Progress Photograph Location : CH 13+750 (Mainline) Description : Preparation of formation (view looking southbound)
Progress Photograph Location : Bridge No.6 - Sg. Batang Benar Description : Bored pile works in progress
Progress Photograph Location : Ch 14000 (Mainline) Description : Preparation of formation level in progress
Progress Photograph Location : CH 14+750 (Mainline) Description : Laying of sub-base (view looking northbound)
Progress Photograph Location : Bridge No.7 Description : Bore hole works for soil investigation in progress.
Progress Photograph Location :CH 0+400 Slip Road (Pajam Interchange) Description : Earthworks in Progress
Progress Photograph Location :CH 1+200 Slip Road 2A/2B (Pajam Interchange) Description : Earthworks in Progress
Progress Photograph Location : DBC TR11-1 CH17660 Description : Construction of RC sump in progress
Progress Photograph Location : Pajam Toll Plaza Description : View of site office
THANK YOU PRIVATISATION OF LEBUHRAYA KAJANG - SEREMBAN