30 likes | 155 Views
Community Code Support. In FY2010, DTC will provide support for the following systems: WRF (NMM, ARW, WPS) WPP (WRF post-processing) HWRF (NMM, Tracker, POM, coupler) GSI MET
E N D
Community Code Support • In FY2010, DTC will provide support for the following systems: • WRF (NMM, ARW, WPS) • WPP (WRF post-processing) • HWRF (NMM, Tracker, POM, coupler) • GSI • MET • Taskincludes: user support (in the form of Help Desks, tutorials and documentation), pre-release testing, repository maintenance
WRF/WPP • Continue to provide support for WRF-NMM, and WPP, in collaboration with NCAR/MMM and NCEP/EMC. • Support WRF tutorials, WRF workshop. • Work with EMC to finalize WRF-NMM scientific documentation. • Become familiar with NMM-B code. • Consider sending a scientist to EMC for extended visit • Issues: • NMM is frozen. Need to minimize changes. • Need to establish a software management plan for WPP • Code version control – one version for all supported applications • EMC point of contact for user support • Planning for transition to Unified Post Processor
Test and Evaluation Activities • WRF related tests: • Core tests – finish publications • Vertical levels test – prepare final report • Reference Configurations • Sponsor requested tests • Operational Configurations • Community Contributed Reference Configurations • Number of supported configurations will depend on level of funding • Distribute information/results to community through the DTC website • NAM-GFS precipitation forecast comparison • Demonstrate advanced verification techniques in MET • HFIP High-Resolution Hurricane – publications • AFWA GSI baseline test