70 likes | 91 Views
There are many theories, methods, tools, software offers and opinions on effective design for manufacturing. Taking a step back however and considering the big picture there are 2 key points that must be regarded before embarking on DFM enhancement. Get Design for Manufacturing by vayoinfo @ http://www.vayoinfo.com/design-for-manufacturing/<br>
E N D
Design For Manufacturing Fast placement programming intelligent software, pleasant work www.vayoinfo.com
Company introduction Founded on Jan of 2005, headquarter in China/Shanghai; Dedicates to intelligent NPI software to accelerate design to manufacturing; Fully in-house development, owns copyrights and patents; Product installed >20 countries and regions worldwide; Strategy partnership with equipment and EDA provider: Keysight/ViTrox/TRI/Fuji/Panasonic/Altium… >10 years dedication on NPI technology brings up the world-class product.
Change from smart placement programming Past Yesterday Today Vayo customer solved this issue. They may still happen at your side. Above issues puzzles most of us. Ex.: Venture/Compal/Intel/AlphaEMS/… Vayo smart programming solution reduce your business risk!
Business Advantage Enhance support to more data source, enhance NPI capability; Fast equipment program preparation, save NPI cycle; reduce inline fine-tune cycle and increase equipment utilization; Automatic and simplify the process of program preparation, reduce human errors and decrease the qualification level of people; Increase manufacturing capability, reduce cost.
Advanced Extension: Data Validation Headache: Program/recipe error caused by ECO change or manual fine-tune Solution: Compare CAD, BOM, SMT program or feeder list and generate professional comparison report. Validation Report Validation Report
Business risk of manual placement programming Who could commit correctness of each placement program? One wrong polarity error could bring business risk of order cancel, discontinue cooperation with your Top 1 customer. The polarity/rotation/offset for each part should be confirmed for placement program; while it is inspected by eyes of the engineer/technician one by one. More and more NPI per week due to shorted product replacement cycle; it could be several, couples, hundreds placement program to be prepared, and every PCBA contains hundreds and thousands components. We are all human, not robot. Manual program approach — nobody could guarantee the correctness of each placement program.
Thanks! intelligent software, pleasant work www.vayoinfo.com