1 / 8

Monday 22.11.

Monday 22.11. 01h30: Stable beams #1506. 08h29: Adjust mode. Transverse dampers to physics setting. Neither negative nor positive effect seen. 09h55: Beams dumped on request. Ramp down and pre-cycle. Other issues followed up:

velika
Download Presentation

Monday 22.11.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Monday 22.11. • 01h30: Stable beams #1506. • 08h29: Adjust mode. Transverse dampers to physics setting. • Neither negative nor positive effect seen. • 09h55: Beams dumped on request. Ramp down and pre-cycle. • Other issues followed up: • G. Papotti: Fixed pattern file for BQMSPS, pattern check re-enabled on LHCION2 cycle at the SPS. Satellite thresholds from 20% to 3% again. • L. Jensen: Issues observed this weekend related to the wrong handling of RBAC token for the BCT proxy on cs-ccr-cmw4 have been understood by the CMW team. They have now restarted the proxy and the BCT sequencer task should no-longer fail. In parallel a separation of load between DC and Fast BCTs is being looked into. • 11h14: RU.L4 tripped. Reset and restart it as instructed by piquet. • 12h38: RU.L4 at 400 A. • 13h02: Ramp started. 121b x 121b. 8:30 meeting

  2. Damper Off (Left) / On (Right) 8:30 meeting

  3. No Change of Lifetime 8:30 meeting

  4. Monday 22.11. • 14h07: Stable beams. Fill #1506. • 15h17: Trip Q9.R2. Beam dump. Sector 23 tripped. • PIC event chain: quench loop of RQ9.R2 was opened  global protection mechanism  … • 15h42: Ramp down. Pre-cycle 23 individually. • 18h20: Injection. Various problems” • IQC does not get MKI data. Restart of 2 IQC processes. • Circulating bunch configuration is not updated in the BQM GUI and in the injection sequencer. • Publications from DB is not working properly. • PS cavity problem. • 20h57: Ramp started. 121b x 121b. • 22h00: Stable beams. Fill #1511. 8:30 meeting

  5. Ion Stable Beams 8:30 meeting

  6. PIC Event Chain 8:30 meeting

  7. What Affected Q9.R2? Noise? 8:30 meeting

  8. Ahead 8:30 meeting

More Related