110 likes | 197 Views
White Block Louvre Blades Project (Before 1 st phase replacements). White Block Louvre Blades Project (Before 1 st phase replacements). Changing White Block Louvre Blades (work-in-progress). Changing White Block Louvres (phase 1 completed).
E N D
White Block Louvre Blades Project (Before 1st phase replacements)
White Block Louvre Blades Project (Before 1st phase replacements)
Changing White Block Louvres (phase 1 completed)
Changing White Block Louvres (Phase 2 completed)
White Block Corridor Ceiling Painting Completed (Wall painting work-in-progress)