RedIRIS-NOVA real experiencies of tendering and deploying an optical network in Spain TERENA TF-MSP “Non-technical aspects of dark fibre” Workshop Amsterdam - 9 and 10 November, 2010 Esther.Robles@rediris.es RedIRIS Network Manager RedIRIS/Red.es
RedIRIS10 Highlights... • 20 PoPs: > 13.000 km distance • 156 Gbps backbone • 43 links: 10GE, STM-16/4/1 • Leased Capacity to T-Systems and Telefonica • GEANT IP access: • 10Gbps @ ES PoP • 2.5Gbps @ FR PoP (bck) • GEANT Lambda Service: • 3 x 10Gbps E2E links • 2 Transit Providers (Madrid) • Telia and Global Crossing @ 10Gbps • IXPs presence: • ESPANIX @ 10Gbps (Madrid) – 59 peerings • CATNIX @ GE (Barcelona) – 19 peerings • Institutions Access Links • 10 GE • n x GE • FE TF-MSP “Non-technical aspects of dark fibre” Workshop.
RedIRIS Users Classification other 15% R&D Centers 35% R&D Management Institutions 17% Health institutions 13% Universities 20% TF-MSP “Non-technical aspects of dark fibre” Workshop.
RedIRIS Traffic Trends (PBytes) 40,5 PB around 1,45 /year 9,5 PB 2.5Gbps Backbone 10 Gbps Backbone TF-MSP “Non-technical aspects of dark fibre” Workshop.
Network Resources Consumers Examp. • BSC-RES project: Supercomputing national initiative at 10Gbps • DEISA project: EU supercomputing network at 10Gbps. • LHC infrastructure support (nx10Gbps) • PASITO: Spanish experimental testbed network • RENEM (National Emergency Network): high availability and specialized support. • e-VLBI network support • ... TF-MSP “Non-technical aspects of dark fibre” Workshop.
... and telescopes in Canary Islands • 10.4m telescope with a segmented primary mirror. • Currently, the biggest telescope in the world. • http://www.gtc.iac.es/ TF-MSP “Non-technical aspects of dark fibre” Workshop.
after RedIRIS10... RedIRIS-NOVA Spanish government commitment to build a photonic network based on dark fiber TF-MSP “Non-technical aspects of dark fibre” Workshop. • RedIRIS10 contracts will end in October 2011 • The historical leased capacity model does not scale for the new e-Science challenges: • no Flexibility • limitations to develop advanced functionalities • high Costs • Globally, Educational and Research Networks are evolving to a model based on own dark fiber... or, more accurate, have evolved !
RedIRIS-NOVA project • 138 MM€ : EU structural + Science and Innovation Ministry + Regional Governments funds • National coverage requirements: • Penninsula and Islands ( Cannary and Balears) • Ceuta and Melilla ( Norh Africa Spanish Cities) • Competitive Dialog Tender Process helps to know the dark fiber market in Spain and to define the tender requirements: • RFI in Oct/Nov 2008 • Dialog Process: December 2008 to July 2009 • Evaluation: September & October 2009 • Tender structured in 3 lots: • Guaranteed Fiber within the penninsula and housing facilities • Guaranteed Fiber with Canary Islands and housing facilities • Optical Equipment • 25 companies applied to participate and 23 companies joined in Dialog: • 10 fiber providers • 13 equipment vendors TF-MSP “Non-technical aspects of dark fibre” Workshop.
PoPs Redundancy • C1 PoP ( ): Its connection within the DF network requires a high reliability level. At least, two completely diversified routes with other two C1 PoPs • C2 PoP ( ): The realibility expectations are not so high ( not a core institution or economically not affordable) and the redundancy requirement is relaxed: ony one route required and one building access TF-MSP “Non-technical aspects of dark fibre” Workshop.
Fiber Tender Results ... • Islalink fiber as Canary Islands supplier TF-MSP “Non-technical aspects of dark fibre” Workshop. • Telefónica as peninsula fiber supplier
RedIRIS-NOVA fiber footprint I Iberia OpticalRing Dual FCCN opticalfiberinterconnection Splicesalready done Additional PoPs will be added TF-MSP “Non-technical aspects of dark fibre” Workshop.
RedIRIS-NOVA fiberfootprint II 1.504 km 232 km 143 km TF-MSP “Non-technical aspects of dark fibre” Workshop.
Guaranteed means... • Fiber Quality will be guaranteed until IRU ends: • Keep installation fiber parameters • No-complianced fiber spans will be swapped • 24/7 hot line • Supplier is responsible for end to end fiber quality ( even optical panel connector) • Optical Fiber Supervision System based on OTDR measurements, via: • A spare single fiber in same cable RedIRIS-NOVA fibers (selected) • OR • RedIRIS-NOVA fibers @ 1650nm • Housing facilities with guaranteed service: power supply, air conditioning, 24h independent access... • Classical operational model adapted to a fiber infrastructure • Integrated with new RedIRIS procedures • Failures Response Times Specification via SLAs: • Leased capacity approach adapted to a fiber infrastructure scenario • SLAs model discussed with bidders • PMD <= 0.50 ps/√km (0.20) QUALITY OPERATION MAINTENANCE TF-MSP “Non-technical aspects of dark fibre” Workshop.
Failures and SLAs definition ... • Failures classification • Complex Failures ( CF): Fiber outages or degradations that require special (≈ long) works to be fixed • Normal Failures ( NF): no special works • Service Level Agreements (to Fiber Links) • Fiber Link Availability (monthly): 99.2% just for NF times • PoP Availability (monthly): 99.98%, both CF + NF • Mean Times between Failures : 180 days (365 subm. )for CF and 30 days for NF • Maximum Unavailability Time for CF per 12 months periods: 30 hours for each 1.000km of fiber. • Time to Repair: 12 hours (20 days subm.) for CF and 8 hours (10 days subm.) for NF • Frequency of Failures (measured over 12 months periods): • 3 for CF and 6 for NF. • Fiber spans would be swapped if threshold is reached. Fiber Link (includes even the connector at RedIRIS optical panel) Fiber span Fiber span PoP PoP ILA TF-MSP “Non-technical aspects of dark fibre” Workshop.
SLAs penalties ... • Deployment phase • Delays in deployment • Operational phase • ILA housing conditions failures • No collaboration with 3rd party entities • Fiber link unavailability • PoP unavailability ( simultaneous outage or degradation for all PoP fibers) • To exceed Meant Time Between Failures parameter for each fiber link • To exceed the Maximum Number of CF per 12 months periods • To exceed the Maximun Time to Repair • Improper fiber operations • How are penalties charged with an up-front payment model ? • Provider set up a “1% contract budget” bank guarantee to support those penallties. • The 1% bank guarantee should be kept until IRU contract ends. Provider must put back money when any penalty reduce it. TF-MSP “Non-technical aspects of dark fibre” Workshop.
RedIRIS-NOVA PoPs I • Requirements • Supply the required conditions to operate the RedIRIS-NOVA equipment (optical, data and management). Requirements depends on PoP-degree • Power Supply ( with backup power generators) • Electrical ground network • Space: ( ... and upto 600kg/rack) • Temperature and humidity... TF-MSP “Non-technical aspects of dark fibre” Workshop.
RedIRIS-NOVA PoPs II • More Requirements... • Interconnection points for RedIRIS members • Physically accesible to RedIRIS staff on a 7x24 basis • Secure access • Neutral to the termination of 3rd party fibre • Technical support and remote hands • Partnership with PoP sites • Add/Drop PoPs (ROADM) site hosts are RedIRIS members • Not a commercial relationship, Win-Win model supported on service. • “Housing Agreement” • Users can interconnect to RedIRIS-NOVA directly or through a Regional Network. TF-MSP “Non-technical aspects of dark fibre” Workshop.
E3 The Regional Networks (RNs) TF-MSP “Non-technical aspects of dark fibre” Workshop.
To Optical Regional Networks... TF-MSP “Non-technical aspects of dark fibre” Workshop. Extend RedIRIS-NOVA fiber footprint to reach RN points. • Great opportunity to improve the RN infrastructure • Contribute to the concurrent evolution of national, regional and intercampus networks User Service Enhacement • RedIRIS Support: As a means for regional networks to acquire and light dark fiber. • Costs: • 12.500 km of fiber with national coverage • Favorable results by aggregating demand • Agreements with Regional Governments • Current tender allows to reach 108 additional PoPs (phase I) • New tenders would be launched as needed (phase II)
Optical Equipment Tender... • Virtual/logical Components Catalogue: • Optical Functionality ≈ Virtual/Logical Component • Vendors Equipment groupped and mapped their hardware list elements to each Virtual Component. • Optical network design for the working scenario based only on Virtual Components • Economical proposals include the cost for each Virtual Component: • Only Virtual Components can be bought to light the real fiber footprint TF-MSP “Non-technical aspects of dark fibre” Workshop. • List of mandatory and optional equipment functionalities. • Hypothetical fiber footprint as working scenario for all bidders • Management and Planification systems required.
Optical Equipment Tender Results • Equipment and service guarantee provider : Telefonica • Service Guarantee to end 2012. • Alcatel-Lucent Equipment:1626 Light Manager Red 5.0A (6.0 update included) • WSS (Wavelength Selective Switch) technology. No O/E/O conversion. • 50 Ghz grid spacing: 93 x 10 G / 80 x 40G • 10G, 40G supported. 100G prepared to be supported when available • 8-degree ( 7x1) • Directionless and colorless support. • EDFA and RAMAN amplification • Variable Optical Attenuators (VOA) in transponders and amplifiers. • Automatic Power Equalization • Automatic Pre-emphasis Adjustment • User ports ( required by RedIRIS): 10GE, GE and OTN. • OSNCP protection 1+1 included. • OSC running at 1510nm (4 Mbps) • GMPLS support • Network Management System: 1350 OMS Rel. 5.0A • Optical Network Design Platform - ONDP Rel. 5.0A TF-MSP “Non-technical aspects of dark fibre” Workshop.
Optical Equipment Guarantee... • 24/7 hot line to fix problems and technical support • Hardware Replace Time: 4 hours • Incident Time Resolution: 4 hours ( critical and high), NBD ( medium), 2 BD ( low) • Direct access to the vendor support center • 5-people operation team ( 24 hours @ RedIRIS offices) • Software Releases • Upgrade upto 2 new software releases per year optical equipment, NMS and planification systeml • Done by supplier ( remotely or in-situ, as needed) • Preventive Tasks • Set of tasks to check the health of patch panels, fiber cords and optical equipments for all sites. • At least, one per year. TF-MSP “Non-technical aspects of dark fibre” Workshop.
Optical Equipment Guarantee... • Corrective & Scheduled Maintenance Works • Reports • Technical Documentation • Complete access to the technical documentation ( even the private one): hardware, functionalities, bugs, interoperability... • Regular (quarterly) Technical Workshops to present 12 months roadmap:: hardware and functionalties. TF-MSP “Non-technical aspects of dark fibre” Workshop.
RedIRIS-NOVA services • Global IPv4 and IPv6 reachability • Multicast • DNS • IPv4 and IPv6 address space management • NTP • Ethernet Layer • Wavelengths between RedIRIS PoPs: • Unprotected • Protected and/or • With Restoration • Wavelengths between Shared PoPs and/or RN PoPs: • By Type: • Unprotected • Protected and/or with Restoration • By Use: • IP Regional Network Support • Projects Support RedIRIS community Optical Regional Networks RedIRIS community IP services PrivateCircuits Performance Monitoring Tools TF-MSP “Non-technical aspects of dark fibre” Workshop.