Rail Runner Wireless System Project Certification Committee Presentation

Rail Runner Wireless System Project Certification Committee Presentation. September 28, 2011. To provide 99.9% wireless service allowing passengers to stay connected throughout their use of the NM Rail Runner train transportation system and stations.

vesta
Download Presentation

Rail Runner Wireless System Project Certification Committee Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rail Runner Wireless System Project Certification Committee Presentation September 28, 2011

  2. To provide 99.9% wireless service allowing passengers to stay connected throughout their use of the NM Rail Runner train transportation system and stations. Implement a wireless system that is flexible and scalable as the service area for the Rail Runner expands. Future capabilities may eventually include services as ticket vending, ticket verification, failover operations communications, emergency phones, video displays on both the trains and the platforms, and video surveillance equipment. Objective:

  3. Issues: • Gaps in Coverage along Rail Route • FCC Radio Frequency Issue

  4. Progress: • Contract Extended to February 29, 2012 • Contractor will: • reengineer wireless network for optimization and for compliance with FCC regulations • replace radios and antennas as needed • build additional towers as needed • NMDOT to Test and Accept System 4

  5. Status: • No new budget or expenditures • Contractor to absorb the costs for: • reengineering • equipment refitting, and • additional towers Life of Project Budget Budget: $2,656,237 Expended $2,189,651