180 likes | 280 Views
LHC Collaboration Meeting @ KEK April 2-3, 2001 T. Page - Fermilab. Corrector Locations. Alignment Requirements. Corrector Displacement: 500 m m [0.0197 in] Corrector Roll: 5 mrad. Corrector alignment Oversized holes in corrector flange to allow for adjustment.
E N D
LHC Collaboration Meeting @ KEKApril 2-3, 2001T. Page - Fermilab
Corrector Locations T. Page
Alignment Requirements • Corrector Displacement: 500 mm [0.0197 in] • Corrector Roll: 5 mrad • Corrector alignment • Oversized holes in corrector flange to allow for adjustment. • Outside diameter of skin will be used for lateral alignment. • Dowel holes in coil / scribe line will be used for rotational alignment. T. Page
KEK End Ring Design T. Page
Q1 & Q3 Interface Drawing T. Page
KEK - MCBX Mounting (Q1 & Q3) • (1) MCBX Mounting Ring • (KEK cold mass dia.=490mm) T. Page
MCBX Corrector Mounting T. Page
MCBX Cross-Section (Q1 LE) T. Page
KEK - MQSXA Mounting (Q3) • (2) MQSXA Mounting Ring • (KEK cold mass dia.=490mm) T. Page
MQSXA Corrector Mounting T. Page
MQSXA Cross-Section (Q3 LE) T. Page
KEK Mounting Cross-Sections T. Page
Fermilab - MCBX Mounting (Q2A) • (3) MCBX Spacer • (Fermilab cold mass dia.=416mm) T. Page
MCBX Shipping Restraint T. Page
MCBX Shipping Restraint T. Page