1 / 52

7th Inter-Parliamentary Meeting on Renewables Berlin, October 5 th + 6 th 2007

7th Inter-Parliamentary Meeting on Renewables Berlin, October 5 th + 6 th 2007 Integration of large scale renewable energy into the grid Ralf BISCHOF Managing Director German Wind Energy Association / Bundesverband WindEnergie (BWE). Example: Wind energy in Germany. Status quo 2006.

vida
Download Presentation

7th Inter-Parliamentary Meeting on Renewables Berlin, October 5 th + 6 th 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 7th Inter-Parliamentary Meeting on Renewables Berlin, October 5th + 6th 2007 Integration of large scale renewable energy into the grid Ralf BISCHOF Managing Director German Wind Energy Association / Bundesverband WindEnergie (BWE)

  2. Example: Wind energy in Germany

  3. Status quo 2006

  4. Wind Energy in Germany – data end 2006

  5. Wind energy in Europe: installed capacity

  6. Target 2020

  7. Target 2020 = 150 TWh/a = 36 TWh/a

  8. VorherWindpark Simonsberg (Schleswig-Hostein) Nachher

  9. Repowering Double capacity [MW] + tripple power [kWh]

  10. target: 55.000 MW until 2020! Are 100% wind power feasible?

  11. Yes! – 2006 in West-Denmark Quelle: DENA

  12. Technology developemt – full load hours

  13. Increase in capacity and efficiency:Development of turbine technology

  14. Verbesserung der Erträge und Verstetigung – Beispiel I • Modellentwicklung eines deutschen Herstellers • Alle Anlagen: • 2.000 kW Nennleistung • 98 m Nabenhöhe • mittlere Windgeschwindigkeit 6,64 m/s (Durchschnitt) • Rotordurch- Prototyp Ertrag Steigerung Volllast- • messer aufgestellt p.a. stunden • 70,4 m 2002 4,31 GWh/a 2.156 h/a • 71,0 m 2003 4,87 GWh/a + 13% 2.434 h/a • 82,0 m 2005 5,82 GWh/a + 35% 2.909 h/a • #

  15. Verbesserung der Erträge und Verstetigung – Beispiel II • Zusätzlich am gleichen Standort mit 138 m Nabenhöhe: • Rotordurch- Prototyp Ertrag Steigerung Volllast- • messer aufgestellt p.a. stunden • 82,0 m 2005 >6,5 GWh/a >+ 50%>3.250 h/a • Nächste Schritt: 90 m Rotordurchmesser?

  16. Die Entwicklung geht weiter …. … 160 m Nabenhöhe in Laasow/Brandenburg

  17. Die Entwicklung geht weiter …. … Nabe einer 6-MW-Anlage mit 114 m Rotordurchmesser

  18. Grid integration issues

  19. General grid and system issues Quelle: DENA

  20. Relation between costs and benefits • Requirements for „low shares“ of wind energy in the system • (WEC capacity < minimum system load) • Requirements for “high shares” of wind energy in the systems • (WEC capacity > minimum system load)

  21. Focus: Requirements for „low shares“ of wind energy in the system • System services can be provided by residual conventional power plants • But some contributions of wind farms are indispensable already now • Reactive power (decentral!) • Congestions management (distribution level) • Low voltage ride through = LVRT • Reaction to disturbances (e.g. under-/overfrequency) • … • Some examples

  22. Simple reactive power requirement: limits for power factor Stand: 31.03.2002 Germanischer Lloyd WindEnergie GmbH

  23. Advanced requirement: reactive power – voltage regulation

  24. LVRT: Grid code requirements for new (and old?) turbines Quelle: DENA

  25. Disturbance 4.11.2006: Overfrequency in North/East-UCTE

  26. Disturbance 4.11.2006: Overfrequency in North/East-UCTE

  27. Disturbance 4.11.2006: Reaction of WECs in E.on grid Quelle: DENA

  28. Grid capacity

  29. Grid integration – current issues in Germany • Production management already applied in some regions – grid expansion needs to happen more speedy • Grid operators are obliged to expand grid • In the meantime: demand for optimised use of grid, consideration of application of underground cable • Example for optimised grid use through overhead-line monitoring: • Depending on ambient temperature and wind speed increase of transmission capacity up to 50 % • Only temperature: 1 % capacity per degree (ambienttemperature / Celsius)

  30. Netzausbau, Netz- und Erzeugungsmanagement Strombelastbarkeit eines Freileitungsseiles mit und ohne Sonneneinstrahlung als Funktion der Umgebungs-temperatur bei erhöhter Windgeschwindig-keit (Queranströmung 1,8 m/s) blau: Einfluß der Umgebungs- temperatur rot: Einfluß der Sonnenein- strahlung

  31. High shares

  32. Lastgang bei zunehmender Windeinspeisung

  33. Lastgang bei zunehmender Windeinspeisung Quelle: DENA

  34. Lastgang bei zunehmender Windeinspeisung Quelle: DENA

  35. Lastgang bei zunehmender Windeinspeisung Quelle: DENA

  36. Ergebnis Mit zunehmenden Anteilen von Windstrom verschwindet der Bedarf an Grundlastkraftwerken Faustformel: 40.000 MW Wind verdrängen 10.000 MW Grundlast Detailuntersuchung: in Dena-Netzstudie

  37. ~ 10 GW Dena-Netzstudie: Residuale Last im Jahr 2015 35,9 GW bzw. 77 TWh/a Wind (13,9% d. Verbrauchs) Stand: 31.03.2002

  38. Lastgang bei zunehmender Windeinspeisung Quelle: DENA

  39. What happens when the wind stops blowing?

  40. Biogas Tagesspeicher

  41. Plug-in-Hybrid

  42. Biogas - Langzeitspeicher In Deutschlandgibt es Erdgasspeicher mit einem Volumen von 32,6 Mrd. Kubikmeter. Das Arbeitsvermögen entspricht über 80 Tagen Speicherkapazität.

  43. Speicherwasserkraft in Skandinavien • Speicherinhalte (100%) • Norwegen 84 TWh • Schweden 34 TWh • Finland 5 TWh • Summe 123 TWh = 3 Monate des deutschen Stromverbrauchs

  44. Speicherwasserkraft im Nordpool Stand: 31.03.2002 Quelle: www.nordpool.no 100% = 123 TWh

  45. Stand: 31.03.2002

  46. Stand: 31.03.2002

  47. Stand: 31.03.2002

  48. Seekabel Kontinent - Skandinavien • Vorhanden • 3 x West-Dänemark – Norwegen (Skagerrak), 1.000 MW • West-Dänemark – Schweden (Konti-Skan), 380 MW • Deutschland - Ost-Dänemark (Kontek), 550 MW • Deutschland – Schweden (Baltic), 450 MW • Polen-Schweden (SwePol), 450 MW

More Related