1 / 9

January 2009

January 2009. PREP & LOAD chambers: these work well. HV chamber : 30C photocathode lifetime. Expected at least 100C. Field emission killed photocathode in 2007. M. Poelker 4/17/09. March ‘09 SAD. PREP and LOAD chambers : no change. New HV chamber. Anticipate good lifetime Ready for Fall.

vila
Download Presentation

January 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. January 2009 PREP & LOAD chambers: these work well HV chamber : 30C photocathode lifetime. Expected at least 100C Field emission killed photocathode in 2007 M. Poelker 4/17/09

  2. March ‘09 SAD PREP and LOAD chambers : no change New HV chamber. Anticipate good lifetime Ready for Fall Second solenoid added to null phase advance. Electrode replaced: a working spare (?)

  3. Summer ‘09 SAD • Spin Flipper: Stage 1 • Remove unbaked girder region between valve & chopper • Install new “normal” Wien for Physics program, with quad correction • Thoroughly test & transfer functionality for setting pol. • No need to move laser room. Install “inverted” gun Commission at 100kV, push to higher voltage for better transmission, Evaluate capture ops Preserve baked region, continue R&D/BS during Fall H-Wien + Quads Harp/A2 “match point”

  4. Winter ‘10 SAD • Spin Flipper: Stage 2 • Replace baked region with spin flipper (vertical Wien filter + solenoid(s) and quads. • Maybe tilted pole Wien designed specifically for 90 deg operation at given known gun voltage Modify inverted gun if necessary, hopefully not Upgrade the “blue tank”? Same Wien filter to set longitudinal polarization for Physics Spin Flip V-Wien Spin Flip Solenoid H-Wien + Quads Harp “match point” Harp/A2 “match point”

  5. New A1/A2 layout nearly complete

  6. J. Grames modeling new beamline with ELEGANT. Agreement with Parmela. Now turning ON Wien and setting quad strengths and positions……

  7. Darmstadt quad triplet Custom crosses, nipples, bpms, viewers, harp, ion pumps, mounting fixtures, girder, magnets, New A1 dif pump

  8. Magnets • “ordered” six sets of CEBAF skew quads • Jay/Joe/Danny working to build at least three Darmstadt quad triplets • Need to order at least two FEL-type solenoids • Need to design and manufacture tilted-pole magnet for “self-correcting” 90-degree Wien • Earth field bucking magnets…

  9. The Workload • Beamline Optics for PQB: Joe, Yves, Reza • Design/Engineering: Danny M. and Karl S. • Magnet Design: Jay, Mike T.? • Parmela Verification: Yuhong, Ashwini • Inside and Outside machine shops…

More Related