1 / 43

Safer façade Connections - Revolutionary Changes World of Fa çade s – Ahmedabad – Oct. 2012

Safer façade Connections - Revolutionary Changes World of Fa çade s – Ahmedabad – Oct. 2012 Bhisham Vaswani. CHANGE. Misunderstanding Different opinion Fear …. Changes. Free of Cost. ₹ 1.00. ₹ 10.00. Changes. Changes. Change is the pre-condition for growth!

vinaya
Download Presentation

Safer façade Connections - Revolutionary Changes World of Fa çade s – Ahmedabad – Oct. 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safer façade Connections - Revolutionary Changes World of Façades – Ahmedabad – Oct. 2012 Bhisham Vaswani

  2. CHANGE Misunderstanding Different opinion Fear …

  3. Changes... Free of Cost ₹ 1.00 ₹ 10.00

  4. Changes...

  5. Changes... Change is the pre-condition for growth! Why do we fly today and not travel to other destinations for meetings or holidays by cycle or bus anymore? Why do we not take two stones at home and light fire? There are three very simple answers to the above

  6. Changes... TIME SAFETY QUALITY COST Three points that help make our facades simply the best! This goes for all the products and services used in facade!

  7. Connecting the Facade CW can be fixed by drilling bolts into the concrete OR by welding as seen in the picture above BUT…

  8. Connecting the Facade Time?

  9. Quality & Safety of Façades Safety?

  10. Connecting the Facade Safety?

  11. Connecting the Facade Quality?

  12. Solution What we require are two simple steps in order to avoid the above: • Pre-planning • Higher initial procurement cost Result will be • On time or before time completion of project • Lower total project cost • Best possible qualitative and safer facade

  13. Planned Project

  14. Solution – Cast-in Channel One of the many solutions for the above is HALFEN Cast-in Channel

  15. Cast-in Channels ANIMATION

  16. Channel Profiles Hot rolled anchor channels type HTA

  17. Channel Profiles Cold formed serrated anchor channel type HZA 41/22

  18. Channel Types Channel pairs Corner elements HTA / HGB Special constructions for special applications Channels with welded-on reinforcement bars

  19. Channel Application – Top of Slab Curtain wall glass element Curtain wall bracket HTA channel (located top of floor slab)

  20. Channel Application – Top of Slab Connecting part to mullion (part of bracket type HCW-B2)for vertical adjustment HTA channel for horizontal adjustment parallel to concrete edge basis angle of Halfen curtain wall bracket type HCW-B2 for horizontal adjustment perpendicular to concrete edge

  21. Channel Application – Face of Slab Horizontal HTA channel positioned front of floor slab Halfen curtain wall bracket type HCW-ED Three way adjustment provided using HTA cast-in channel together with HCW-ED aluminum bracket

  22. Other Applications of Channels • Fixing of Guide Rails and Doors in Elevators • Fixing of Seats in Stadiums • Hand Railings • MEPs in all various buildings and tunnels • Machinery fixing • Facade Cleaning • Scaffolding • Etc.

  23. Other Products of HALFEN for Façade Natural Stone Support Systems Grout-in Anchor Body-Anchor Channel Sub-Structure

  24. Other Products of HALFEN for Façade Tension Rod Systems • Tension rod system DETAN with several couplers • Tension rod system DETAN with several “couplers with lug“

  25. Other Products of HALFEN for Façade Concrete Facade Panel Anchor Systems

  26. HALFEN references of Pre-planned projects in India World Crest, Mumbai Client - Lodha Façade Contractors - Aluplex No. of Cast-in Channels – Approx 90,000

  27. HALFEN references of Pre-planned projects in India QC 1 Gandhinagar, GIFT CITY QC 2 Gandhinagar, GIFT CITY

  28. HALFEN references of Pre-planned projects in India Shapath V, Ahmedabad

  29. HALFEN references of Pre-planned projects in India Mahatama Gandhi Exhibition & Business Centre, Gandhinagar, Gujarat

  30. Planned

  31. HALFEN references of Pre-planned projects in India ICICI Bank Building, Hyderabad

  32. HALFEN references of Pre-planned projects in India The Kohinoor - Mumbai

  33. HALFEN references of Pre-planned projects in India The Capital, Mumbai

  34. HALFEN references of Pre-planned projects in India Four Seasons Hotel, Mumbai

  35. HALFEN references of Pre-planned projects in India Ahuja Towers, Mumbai

  36. HALFEN references of Pre-planned projects in India Godrej One, Mumbai

  37. And many more… & To sum up the presentation…

  38. Summary Drilled Bolt • HALFEN Cast-in Channel :- • Only simple tools needed for installation. • Can be installed without power supply. • Easy and fast to install without special training. • Components protected from corrosion by quality galvanizing and plating. • Easily adjustable connections. • Fully tested components with verified load capacities. • Instant loading without waiting for a chemical resin anchor to harden. HALFEN = A to Z Project Support including Pre- and Post Sales Services!!!

  39. Let‘s Pre-plan!

  40. Thank You… YOUR BEST CONNECTIONS