1 / 7

Rapidzone Operation: Network Data Sharing

vince
Download Presentation

Rapidzone Operation: Network Data Sharing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Rapidzone Operation: Network Data Sharing Discharge air temp information is broadcast to zone controllers via E-Bus

    2. Zone Controller Operation: DAT Control

    3. Setpoint Knob Operation Setpoint knob determines centre of deadband between heating and cooling Example: deadband is set for 6° knob set for 73° heat setpoint becomes 70 ° cool setpoint becomes 76 ° deadband exists between 70 ° - 76 °

    4. Rapidzone Operation: Terminal Loads Terminal Load: zone deviation from setpoint Terminal Load is broadcast from each zone to RTU via E-Bus < 20 % zone is satisfied > 20 % zone requires heating or cooling Zones can be configured as ‘priority’, terminal load multiplied by 1.5

    5. Terminal Load RTU will run in cooling mode until Zone 3 is satisfied (TL drops below 20%) Zones 1 and 2 remain closed or in minimum position

More Related