An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs

  2. H building progress (Dorm)

  3. H building progress • Jeff Winston welding the metal beams on the H Building • Pastor Joel and his crew assembled the main support beam and lifted the cross beams

  4. H Building update • The Block work on the North side of the building is nearly done • Next we will put up the beams on the North side

  5. Fall 2007 Security and Safety measures • It is our goal to completely secure the property by the end of 2007! • We will do this in four phases.

  6. Phase 1 Metal Fence Construction along the North Wall • Priorities: • Safe and Secure environment • Open and inviting place for ministry

  7. Phase 1 Metal Fence Construction along the North Wall • Each fence section costs $327.00 • All 13 sections cost a total of $4,252 (including material and labor)

  8. Phase 1 Metal Fence Construction along the North Wall • The metal fencing will provide the necessary security! • The metal fencing will allow for a transparent and inviting ministry environment

  9. Phase 2Metal Gate North Wall main entrance • The main gate will be built to last! • Two 15’ wide by 8’ high gates will span the 30’ opening • 4” steel gate posts, • Solid steel beams • Built to take abuse even from a 15 passenger van!

  10. Phase 2Metal Gate North Wall main entrance • $710 USD • The price for Materials and Labor for this 30 foot wide double gate!

  11. Phase 3 Finish the Rest of the Block Wall • We are nearly finished!!!! • The block parts of the wall are 94% finished! • We only need 900 more blocks to be done with the block wall FOREVER!!!

  12. Phase 3 Finish the Rest of the Block Wall • $1066 USD • For materialsand labor • This includes filling in the block with cement for structural strength and replacing blocks that have fallen out

  13. Phase 4South Wall gate and metal work • 13 fence sections ($327 ea) • South Metal Gate ($710)

  14. Totals • Phase 1 • Metal fencing on North Wall = $4,252 • Phase 2 • 30 foot front gate (double hinged) = $710 • Phase 3 • Finish ALL Block work on Wall = $1066 • Phase 4 • Finish South Wall (gate / sections) = $4,962 • Total = $10,992