An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Improved Recovery Demonstration for Williston Basin CarbonatesDE-FC22-93BC14984 Luff Exploration Company Mark Sippel, Consulting Engineer

  2. Location of Project Demonstration Sitesin the Williston Basin

  3. Project Objectives • Better Reservoir Characterization • Regional Studies • 3D Seismic • Better Completion Efficiency • Jetting Lance Perforating • Amoco Sidewinder Short Radius Drilling • Horizontal Mudmotor Drilling

  4. Statement of ProblemsReservoir Characterization • High Drilling Cost • 2D Seismic Used for Structure Delineation • Small Structures, Less Than 1 sq. mile • Optimal Reservoir Quality Frequently not Found at Crestal Position • Reservoir Characterization from Seismic Attributes in Infancy • 3D Seismic Had not Been Used Locally

  5. Statement of ProblemsCompletion Efficiency • Perforation and Acid - Standard Completion • Hydraulic Fracturing Communicates with Water Zones • Low Primary Recovery • Low Water Injectivity for Waterflooding

  6. Type Log forRed River Formation The Upper Red River Consists of Four Episodes in Shallow Shelf Carbonate Setting Main Reservoirs are: Red River B Zone Red River D Zone

  7. Seismic Time Seconds 0.5 mile 0.8 km Original Drilling Strategy (1970’s)One Well for Each Small-Structure Feature

  8. Time Seconds Normal Polarity Reverse 0.7 0.8 Mission Canyon 0.9 Duperow Interlake 1.0 Red River P1 T1 Base D zone P2 T2 Winnipeg 1.1 ForwardSeismic Modeling Upper Red River Reservoirs Are “Seismic Thin Beds” Reservoir Information Contained in Two Peak-Trough Pairs Each Event Consistently Labeled in Every Seismic Survey

  9. Low Porosity High Porosity 0.0 Interlake Time - Seconds Red River 1.0 P1 T1 P2 T2 Winnipeg Synthetic Seismogram Weak Amplitude Response Strong Amplitude Reponse

  10. Reservoir Variationin Red River D Zone C Anhydrite Red River D Zone Weak Amplitude Response Low Porosity Strong Amplitude Reponse High Porosity

  11. Example of Red RiverSmall-Structure Feature Amplitude Response High Porosity Red River Time Structure 1 msec = 5 ft Low Porosity

  12. Demonstration Site 1Small-Structure Red River Feature Amplitude Response High Porosity Red River Time Structure 1 msec = 5 ft Original Well Low Porosity

  13. Production Rate - Time GraphDemonstration Site 1 Depletion of Crestal Well New Drilling

  14. Cumulative Production - Time GraphDemonstration Site 1

  15. Demonstration Site 2Small-Structure Red River Feature Amplitude Response High Porosity Original Well Low Porosity

  16. Production Rate - Time GraphDemonstration Site 2 Depletion of Crestal Well New Drilling

  17. Cumulative Production - Time GraphDemonstration Site 2

  18. Completion EfficiencyHorizontal Wells for Waterflooding • Low Water Injectivity in Vertical Completions at 100 - 150 bwpd • Local Industry Prejudice of Early Water Breakthrough • Successful Waterflooding Would Require Downspacing to 80 acre/well • Vertical Well Project - Not Economical

  19. Red River B Zone Type Log Top Red River B Zone 0 100 30% 0% Gamma Ray Neutron-Density Porosity

  20. Jetting Lance Completion TechnologyUnsuccessful

  21. Amoco Sidewinder Completion TechnologyUnsuccessful

  22. North BuffaloRed River UnitDemonstration Site 3 Pilot Horizontal Water Injection Well Pilot Horizontal Water Injection Well Depth Feet

  23. Production Rate - Time GraphDemonstration Site 3

  24. Cumulative Production - Time GraphDemonstration Site 3

  25. Horizontal Wells for Waterflooding • High Water Injectivity at 500 - 1000 bwpd • Early Water Breakthrough Has Not Occurred • Re-entry Laterals Were Drilled from Vertical Wells • Waterflood Reserves Will Equal or Exceed Primary Recovery

  26. Production from Three Demonstration Sites Project Conclusion Current Trend Prior Trend Project Start

  27. Conclusions - Reservoir Characterization • Reservoir Characterization from 3D Seismic is Very Rewarding • Forward Seismic Modeling is a Must • Amplitude Attributes Were Identified for Prediction of Porosity Development in Red River D Zone • Development of Depositional Models • Understanding Importance of Depositional Setting and Relation to Reservoir Quality (porosity and permeability)

  28. Conclusions - Horizontal Completions • Horizontal Completions Yield High Water Injection Rate and Efficient Waterflood Sweep • Horizontal Injection Rate Five Times that of Vertical Completion (750 vs 150 bwpd at maximum pressure)

  29. Post-Project ContuationReservoir Characterization • Additional Forward Seismic Modeling and Seismic Attribute Study • Better Prediction of Depositional Setting for Each of Upper Red River Zones • Further Integration of Geologic and Production Attributes with Seismic Attributes

  30. Post-Project ContinuationWaterflooding the Red River Fm. • Project Demonstration Waterflood Site was Unitized • Re-entry Laterals Drilled from Four Wells • Peak Waterflood Rate and Reserves Equal to Primary • Two Additional Red River Waterflood Units Formed Since Project Conclusion • Plan Five Additional Units in 2003 and 2004

  31. Post-Project ContinuationCompletion Efficiency • Typical Horizontal Re-entry Completion Yields Three-Fold Increase in Productivity • Horizontal Drilling from Plugged and Uneconomic Vertical Wells Yielded Rates Over 150 bopd • Operator is Agressively Re-Developing Fields That Were Initially Developed in the 1970’s