1 / 25

LOCATIONS OPTIONS

LOCATIONS OPTIONS. Drop TOWER . Thomas Gosnell Hall. Sophia Maggelakis Dean of the College of Science  Professor of Mathematics Office: 1108 Gosnell Hall (585) 475-5127 http://www.rit.edu/cos/deans-leadership-team-staff. Location 1. Thomas Gosnell Hall – Floor plan. Available Height:

vine
Download Presentation

LOCATIONS OPTIONS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LOCATIONS OPTIONS Drop TOWER

  2. Thomas Gosnell Hall Sophia MaggelakisDean of the College of Science Professor of MathematicsOffice: 1108 Gosnell Hall(585) 475-5127 http://www.rit.edu/cos/deans-leadership-team-staff Location 1

  3. Thomas Gosnell Hall – Floor plan Available Height: 1- 46’ 2 - 43’ 3 – 39’

  4. Location 2 Thomas Gosnell Hall • PRO: • Visibility • Access from top • Maximum height • Low traffic area • Good place to install • Some What easy to install Location 3

  5. Thomas Gosnell Hall Location 3 • CONS: • Distance from engineering building • Approval from an non-engineering Dean • Location in a non stake holder building • Access to run the tower, depending building regulations. Location 1

  6. Golisano Hall Andrew Sears Dean and Professor Andrew.Sears@rit.edu 585-475-7203 GOL-1000 http://www.rit.edu/gccis/people

  7. Golisano Hall – Floor plan Available Height: 1,2,3 – 33’-7”

  8. Golisano Hall • PRO: • Visibility • Access from top • Maximum height • Low traffic area • CONS: • High traffic area • Distance from engineering building • Approval from an non-engineering Dean • Location in a non stake holder building • Access to run the tower, depending building regulations.

  9. James E. Gleason Hall Harvey Palmer Dean, Professor, PE hjpeen@rit.edu 585-475-6361 GLE/3205 http://www.rit.edu/kgcoe/facultystaff#office-of-the-dean Location 2

  10. James E. Gleason Hall – Floor plan Available Height: 1- 32’ 2 – 34’ (To roof) 3 – 38’-8” 4 – 26’-10” 5 – 11’ 7”

  11. James E. Gleason Hall • PROS: • Local turf • Visibility • Good place to install Location 2

  12. James E. Gleason Hall • CONS: • No access from top • Obstructs visibility • Can not achieve desired height • Significant amount of traffic Location 2

  13. James E. Gleason Hall – 4th Floor plan(Temporary Location) Available Height: 1 - 17’ 2 - 11’ 4”

  14. Institute hall

  15. Institute hall – floor plan North Door Available Height: 1- 77’-6” Stairs

  16. Institute hall • PROS: • Local turf • Visibility • Good place to install

  17. Institute hall • CONS: • Distance from Engineering

  18. Golisano Institute of Sustainability Dr. Nabil Nasr Associate Provost and Director, Golisano Institute of Sustainabilitynasr@rit.edu585-475-5101 http://www.rit.edu/gis/academics/faculty/#

  19. Golisano Institute of Sustainability – Floor plan Available Height: 1- 2 –

  20. Golisano Institute of Sustainability • PRO: • Visibility • Access from top • Maximum height • Low traffic area • Good place to install Location 1

  21. Golisano Institute of Sustainability • CONS: • Distance from engineering building • Approval from a non-engineering Dean • Location in a non stake holder building • Access to run the tower, depending building regulations. • Altercation to brand new building Location 1

  22. Golisano Institute of Sustainability

  23. Golisano Institute of Sustainability Location 2

  24. OUT-DOORS • PRO: • Visibility • Access from top • Maximum height

  25. OUT-DOORS • CONS: • High traffic area • Access to roof top • Approval from University • Access to run the tower, depending building regulations. • Unpredictable weather conditions

More Related