1 / 12

Caltrans State Programs

Caltrans State Programs. Wendy Johnsen Caltrans, Division of Mass Transportation Wendy_N_Johnsen@dot.ca.gov 916-651-8239 March 19, 2009. Updates. Prop 1B PTMISEA updates TDA Audit requirement Annual report to the CTC, legislature, and website. AB 1072 Researching various issues

Download Presentation

Caltrans State Programs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Caltrans State Programs Wendy Johnsen Caltrans, Division of Mass Transportation Wendy_N_Johnsen@dot.ca.gov 916-651-8239 March 19, 2009

  2. Updates • Prop 1B PTMISEA updates • TDA Audit requirement • Annual report to the CTC, legislature, and website. • AB 1072 • Researching various issues • Survey results from November

  3. PTMISEA • Funds are currently frozen • FY 8/9 Cycle 1 survey • Continuing to accept FY 8/9 Cycle 2 requests until April 15, 2009

  4. TDA Audit Requirement • PTMISEA audits need to be included in annual TDA audits.

  5. PTMISEA FY 2007/08 CTC Annual Report • Gov Code 8879.55 (g) requires the Division of Mass Transportation to report annually to the CTC

  6. AB 1072 • AB 1072, Sponsored by Assembly Member Eng, will continue the program throughout the life of the bond and apply the current formula.

  7. Research Areas • Several research projects underway • Caltrans is working with our districts and local agencies to identify key issues transit providers are facing • Our goal is to identify all challenges and help find or create a solution • The main areas are Operations, Design, Funding, and Research • Let us know if you have new suggestions

  8. Survey Results • DMT invited the participants of the fall joint CalACT/CTA conference to take part in a survey on Barriers to Implementing transit projects on the State Highway System. • Participation was very good and we appreciate your insight • A summary of the results can be found on our website, under “Items of Interest” http://www.dot.ca.gov/hq/MassTrans/

  9. Results • 42 agencies responded to the survey and approximately 90 people attended the evening session at the conference. • Most answers related to funding • Several answers asked for improved communication and information sharing • A few raised specific issues

  10. DMT activities • Training and workshops • Example “Bus Rapid Transit - Policy & System Operation Basics” held via webinar • BRT Technical Advisory Committee • Next meeting April 2, 2009

  11. DMT activities • Problem Statements Integrate BRT into the California Transportation Plan Bus on Shoulder operations guidance State and Clarify the Purpose and Need for Project Initiation Document (PID) and Project Study Report (PSR)

  12. Thank you! Any questions or feedback please contact Wendy_N_Johnsen@dot.ca.gov (916) 651-8239

More Related