1 / 53

NAPUS FALL TRAINING CONFERENCE Saturday, Nov 2, 2013 Jerome Vogel

NAPUS FALL TRAINING CONFERENCE Saturday, Nov 2, 2013 Jerome Vogel. The New MyPO. Access to MyPO is now made completely through eAccess The MyPO Certification Survey – is no longer used In eAccess, request MyPO “Blue Intranet” is no longer used

virote
Download Presentation

NAPUS FALL TRAINING CONFERENCE Saturday, Nov 2, 2013 Jerome Vogel

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NAPUS FALL TRAINING CONFERENCE Saturday, Nov 2, 2013 Jerome Vogel

  2. The New MyPO • Access to MyPO is now made completely through eAccess • The MyPO Certification Survey – is no longer used • In eAccess, request MyPO • “Blue Intranet” is no longer used • To add or remove offices to you MyPO access – • Log onto eAccess, select MyPO and modify your current access by adding or removing the FDB number of the office, submit for approval • No limit on number of offices – but • Each office added will slow down the webpage • eCC access is the same – request office in eAccess • The system will log the user onto eCC automatically when the eCC Cases icon is clicked

  3. The New MyPO

  4. The New MyPO

  5. The New MyPO

  6. The New MyPO APO – Recommend they have MyPO access for all thier assigned RMPOs Offices are still required to log on twice a day If you have questions or problems with the Retail Inventory section – contact Retail - not OPS eCC questions or problems – contact Manager, Consumer & Industry Contact or Holly Johnson at the district end

  7. HQ e4003 Program Replacing the Dakotas Rural 4003 Program • 50% of offices by end of FY13 • 100% of offices by end of CY2013 • eAccess vrs Rural Specialist approval • Ace userid & password used to log on • Official Form 4003 does not display boxes 7

  8. HQ e4003 vrs Dakotas 4003 The center column of the Form 4003 page is the Header 8

  9. HQ e4003 vrs Dakotas 4003 The Line of Travel Worksheet is the Route (Body) Fills the mileage on the form 4003 page 9

  10. HQ e4003 vrs Dakotas 4003 • Dismount Worksheet • Dismount locations • Weekly dismounts • Daily feet • Collection Compartments • Parcel Lockers • Fills the weekly dismounts, weekly dismount distance, number of collection compartments and parcel lockers on the Form 4003 page. 10

  11. HQ e4003 Program • Changes made but not submitted Multiple 4003s created but not submitted 11

  12. HQ e4003 Program • Bank Time actions and Base Hour actions Error Message Changing the number of boxes is a Bank Time action Changing the number of Collection compartments and/or Parcel Lockers is a Base Hour action So the 4003 Program looks for a Base Change 12

  13. HQ e4003 Program • Bank Time actions add/remove time to the route’s “Bank”: • Add/remove miles, boxes, stops • Add/remove dismounts, distance • Base Hour actions add/remove time to the route’s Standard Hours: • Adjustments moving deliveries and territory between routes* • Detour • Collection Compartment • Parcel Locker • Lock Pouch • Seasonal boxes • Hardship deliveries • Vehicle data 13

  14. Base Hour actions change the route’s Standard Hours Bank Time actions change the route’s “Bank” time

  15. The 4241-A doesn’t match the 4003. The mileage, regular, and/or centralized boxes totals are not the same.

  16. Check the effective dates. Make sure they match.

  17. When boxes and miles are added (or subtracted) to a route, the time associated with the changes are put in “the bank”. When the bank gets to +/- 60 minutes, the miles and boxes will update, the Standard hours will change, the Evaluated Hours may change and the bank will reset to 0:00.

  18. This number is the miles the EMA is based upon –it is rounded to the nearest whole mile This number is the actual miles which the route evaluation is based upon Mileage on the 4241-A E = EMA G = Government vehicle, no EMA paid end

  19. BANK TIME Actions • A Bank Time action increases or decreases “Bank” time of the route • Adjustments (simple) & Extensions which • Add/remove miles, boxes, stops • Add/remove dismounts, distance • These are the majority of 4003s submitted

  20. BASE HOUR Actions A Base Hour Action immediately increases or decreases Standard Hours of a route. There are two types of Base Hour Actions • 1. Automatic Base Hour actions: • Collection Compartment • Parcel Locker • Locked Pouch • Vehicle Data • 2. Manual Base Hour actions: • Territorial Adjustments* • Hardship Delivery • Detour • Seasonal Route • Remeasurement • Entered in the Base Change section on the 4003:

  21. 1. Automatic Base Hour Actions • Time Factors: • Collection Compartments - 1 minute • Parcel Lockers - 2 minutes • Locked Pouch - 30 minutes • Vehicle Data - minimum of 30 minutes; determined by route mileage • Standard Hours of the route will automatically change when the 4003 is processed

  22. 2. Manual Base Hour Actions • Time Factors: • Miles - 12 minutes per mile • Stops - Zero (no affect on Standard Hours) • Dismounts - .10 minute per weekly dismount • Dismount Distance - .00429 minute per foot • Dismounts and Dismount Distance are entered by the week: • A 20 foot (round trip) dismount that the carrier does M-F (5 days a week) • adds 5 weekly dismounts and 100 feet to the Weekly Dismount Distance • (20 feet X 5 days/week) • Regular Boxes - "non-L" route - 2 minutes per box plus the Volume Factor • "L“ route - 1.82 minutes per box plus the Volume Factor • Centralized Boxes - 1 minute per box plus the Volume Factor 22

  23. Mixing BASE HOUR Changes • Do not combine Automatic with Manual Base Hour Actions on the 4003 unless it is a Territorial Adjustment. • If both are entered the 4003 will prompt for a Base Change • The Base Change entered will override the Automatic Base Hour Change 24

  24. 25

  25. Base Hour Actions and Bank Time An Automatic Base Hour Action can be submitted when the route has time in the bank (either + or – minutes in the bank) A Manual Base Hour Action will erroneously erase any bank time In most cases these are Hardship and Detour Actions

  26. Entering a Manual Base Hour action when the route has time in the bank Open the 4003, look at Existing values on MainFrame The Standard Hours are 50:12 This route has 15 minutes in the “Bank” 27

  27. Entering a Manual Base Hour action when the route has time in the bank • Calculate the time associated with the type of action, in this case it is a Hardship Delivery which adds .50 miles, 1 dismount/6 days a week and 15 feet daily dismount distance .50 miles = 6.00 minutes 1 dismount x 6 days a week = 6 weekly dismounts which = .60 minute 15 daily feet x 6 days a week = 90 weekly feet which = .39 minute 6.00 + .60 + .39 = 6.99 or 7 minutes a week Add to the route’s Standard Hours 50:12 + :07 = 50:19 If we were to change the route’s Standard Hours on the 4003 and submit, the 15 minutes of Bank time will be lost. 28

  28. Entering a Manual Base Hour action when the route has time in the bank Click on Display 4241A Values This screen will pop up 29

  29. Entering a Manual Base Hour action when the route has time in the bank This displays the miles, number & type of boxes, dismounts & dismount distance on the route when it had zero bank time. Since this time the route has added 4 regular boxes with gave the route 15 minutes in the Bank 30

  30. Pick effective date Choose Hardship Update LOT and mileage in Line of Travel Worksheet Reset Regular boxes back to when bank was zero Update dismounts & distance in Dismount Worksheet 31 Save and Submit to District

  31. After submitting to district this message will pop up Pick “Yes” 32

  32. Next you will get this message. This will rebuild the Bank time back to 15 minutes after the current number of boxes are entered and the Update button is picked 651 33 End

  33. Creating a Route Inspection 4003 34

  34. HQ e4003 vrs Dakotas 4003 35

  35. 36

  36. 37

  37. 38

  38. 39

  39. 40

  40. Now you can edit the line of travel – adjust column widths, row heights, add/delete columns, change font size, etc. end

  41. Rural MOU – Rural Routes in RMPOs • In POSt Plan implemented offices, rural routes domiciled in RMPOs are assigned to the APO finance number. • All regular rural carriers and leave replacements are also assigned to the APO finance number. • After implementation, the RMPO no longer has any rural routes or rural carriers assigned to its finance number. 42

  42. Rural MOU – Rural Routes in RMPOs • Regular Rural Carriers • Seniority for the carriers in the RMPO will be merged with carriers in the APO and any other RMPO assigned to the APO • The Relief Day Work List (RDWL) will remain separate for the APO and each RMPO 43

  43. Rural MOU – Rural Routes in RMPOs • Leave Replacement Carriers • Leave replacement “seniority” will be merged • Determining “the longest period of continuous service in the office” will include the time assigned to the RMPO before the merge • The leave replacement assignment list (matrix) will include all routes in the APO and RMPO(s) • Management will review the leave replacment matrix to determine if additional cross training is necessary 44

  44. Rural MOU – Rural Routes in RMPOs • Leave Replacement Carriers • Each RMPO will be considered a separate delivery unit • RMPO(s) are other delivery units within the office (APO) • When the leave replacement matrix exhausted in the delivery unit, other leave replacements in other delivery units within the office will be designated to work prior to selecting a regular rural carrier to work 45

  45. Rural MOU – Rural Routes in RMPOs • Leave Replacement Carriers • Leave replacements assigned to an aux route in an RMPO will continue in that assignment • A new aux route assignment will be filled by offering the assignment to all leave replacements working in the APO and RMPO(s) 46

  46. Rural MOU – Rural Routes in RMPOs • Job Bidding • All rural carriers will be eligible to bid on all regular route vacancies in the APO and RMPO(s) based on seniority • Afternoon/Saturday Clearance • Record the time used for 6 consecutive delivery days • Base hour change will be made to the route evaluation • Instructions from OPS will be provided 47

  47. Rural MOU – Rural Routes in RMPOs • Local Procedures • Managers responsible for rural routes in RPMO(s) should establish local procedures for: • Submission of leave requests • Stamp Stock replenishment • Administration of Safety/Service talks • Scheduling • Posting of vacancy announcements 48

  48. Rural MOU – Rural Routes in RMPOs • Electronic 4240 Program • The APO office will use the electronic 4240 Program beginning 10/19/2013 • Rural carriers and leave replacements in RMPO(s) will be entered in the APO 4240 • The RMPO will email, fax, or call the APO daily with the rural carriers begin, leave, return, end, lunch and any other time from the previous workday.* • end 49

  49. RDWL - Relief Day Work List • Sign up periods are only available twice a year, the two weeks before the beginning of the rural guarantee period and the two weeks before the first full pay period in May • ALL regular rural carriers regardless of route classification will be given the opportunity to place their name on the list • If a regular carrier is needed to work on the relief day: • Select from the RDWL by seniority on a rotating basis • Accept volunteers from regular carriers not on the list • Force regular carriers not on the list by juniority • (a regular carrier can be bypassed if would cause the carrier to exceed 2080 workhours or 56 actual hours within one week)

More Related