An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Federal Aviation Administration V&V Challenges, Successes, and Ideas for Improvement an In-Service Management View Presented to: Verification & Validation Summit #5 By: Jennifer Duffy, Test Conduct Manager ATO-E Program Operations, Second Level Support Date: November 5, 2009

  2. Federal Aviation Administration ISM Verification Processes ISM Approach: Good verification processes • T&E Gold Standard is a good verification process • Each phase has its own verification effort • Test results are a vital component of the Decision to Deploy • Peer Reviews of work products for technical accuracy Define It Design It Built It Test It Deploy ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009

  3. Federal Aviation Administration ISM Validation Processes ISM Approach: • Validation is part of the process • NAS Change Proposal (NCPs) are typically validated • Operational assessments/evaluations conducted for changes • Validation processes are less solid • Operational requests for changes are often assumed to be valid • Changes are not always re-validated through each phase • T&E Gold Standard and AMS are vague on validation efforts • Original validation history is often lost over time Define It Design It Built It Test It Deploy ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009

  4. Federal Aviation Administration Example Validation Issue ISM Approach: • System X had a Problem Trouble Report (PTR)… • The problem was not directly linked to any requirement • The PTR seemed reasonable • taking numerous hours to change, verify, and deploy • In the end, the request was not valid • taking more hours to remove, re-verify, and re-deploy • The lessons learned • Do not assume all user requests/problems are valid • Ensure changes are validated against the original need • Carry forward information to ISM Define It Design It Built It Test It Deploy ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009

  5. Federal Aviation Administration Why is V&V important during ISM ISM Approach: • Avoiding unnecessary operational impacts • V&V helps ensure operational needs are met • Systems are part of an integrated service • More and more systems are not stand alone in providing a service • V&V is also needed for the service • New capabilities are planned using existing systems • Need to validate system changes against the future needs/requirements Define It Design It Built It Test It Deploy ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009

  6. Federal Aviation Administration Moving forward… ISM Approach: • Clearly define Verification and Validation activities • Clearly identify and perform V&V during each phase • Ensure the activity is about having the “right” system/service • Factor in future needs as part of the V&V activity • Create a seamless approach • Carry forward V&V information from each AMS phase • Carry forward V&V information from each ISM phase Define It Design It Built It Test It Deploy V&V Need & Planning Work Products V&V Design Work Products V&V End Work Products V&V Products/Product Components ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009