140 likes | 261 Views
GÉANT developments and Year-3 Technical Roadmap. Roberto Sabatino TF-NGN Berlin, 1-2 July 2002. Topology. LV. EE. LT. SE. UK. PL. IE. 10Gbps. IL. NL. BE. LU. 2.5 Gbps. FR. DE. CZ. ES. SK. 34 - 622 Mbps. PT. CH. IT. HU. AT. RO. GR. SI. HR. CY. New since April.
E N D
GÉANT developmentsand Year-3Technical Roadmap Roberto Sabatino TF-NGN Berlin, 1-2 July 2002
Topology LV EE LT SE UK PL IE 10Gbps IL NL BE LU 2.5 Gbps FR DE CZ ES SK 34 - 622 Mbps PT CH IT HU AT RO GR SI HR CY
New since April • 2xSTM-4 to Zagreb under test • STM-1 IL-NL in place, IL-IT under test • Malta contract being finalised
tender for connectivity to Ireland • 9 responses to tender • evaluation taken place • 1st set of meetings with bidders 8-9 July • wide ranges of capacities on offer
The (ill) health of carriers • GEANT not affected by teleglobe nor worldcom • KPNQ impact on Commodity IP (DWS) and N.A. research connectivity
KPNQ NORTH AMERICAN RESEARCH CONNECTIVITY 111 8th Ave. Canarie 622M 622M ESNET GÉANT/ GTRN 2.5G UK Abilene switch GÉANT GE DE 2.5G Abilene router ITN 60 Hudson
NEW NORTH AMERICAN RESEARCH CONNECTIVITY 111 8th Ave. Canarie Level-3 622M 622M ESNET GÉANT/ GTRN 2.5G UK Abilene switch GÉANT GE DE 2.5G Abilene router AT ITN 60 Hudson DeTe
N.A. KPNQ connectivity replacement • 3xSTM-16 complete on EU side, almost done in 60 Hudson • QWEST taking over existing NYC connections previously provided by KPNQ • Have in place an STM-4 between Abilene and DE for emergency backup • UK and SE now use GEANT
LT 2.5Gbps LV 2.5Gbps EE PL SE PL UK IL IE NL 2.5 Gbps BE CZ LU LU FR DE CZ 2.5 Gbps 622Mbps ES SK PT CH IT HU 622Mbps RO 2.5 Gbps AT HU GR 2.5 Gbps SI GR HR SI CY
DWS (Commodity IP) • KPNQ service replaced by Telia in UK, DE • under test now • “emergency” service provided to ACONET, CESNET and maybe SANET
Y2 Deliverables • D13.2 Y3 Roadmap due 31 July • D9.6 IPv6 tests 31/8 • D9.7 measurement 31/8 • D9.8 capacity management 31/8 • D9.9 LBE 31/8 • NEWReview Panel (E. Valente, D. Vandromme, S.Starzak, V. Maglaris) need outline 2-3 weeks in advance.
Y3 technology roadmap • Network monitoring tools, specification and deployment of intra/inter domain (QoS) monitoring infratsructure. To include SW developments which can be done in co-operation with other initiatives • user to user performance analysis, using real applications (streaming, video-conferencing) • Definition of organisation of a PERT, sample implementation
Y3 technology roadmap cont. • Optical developments, in consultation with other FP5 and FP6 initiatives. Study of components for future GEANt and NREN networks: • 40Gbps • 10GE • G-MPLS • AA architecture: co-ordination with other task forces. Study of implementation issues for GEANt and NRENs. Sample implementations and final recommendation
Y3 technology roadmap cont. • Multicast: history feature for beacon, experimentation with high capacity streams, SSM, per-group monitoring, setting up of a multicast user expertise group (part of PERT ??) • ipv6: migration steps for GEANT/NRENs, dual stack router performance, MIBS • support for other projects (including “L2” support)