1 / 21

Highlights of RP activities in support of ISOLDE operation and projects

Highlights of RP activities in support of ISOLDE operation and projects. Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others. Outline. Support to activities during the winter shutdown Radiation measurement campaign (shielding assessment)

waneta
Download Presentation

Highlights of RP activities in support of ISOLDE operation and projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others

  2. Outline • Support to activities during the winter shutdown • Radiation measurement campaign (shielding assessment) • Studies for the robots (target handling) replacement project • Conclusions ISOLDE Workshop and Users meeting 2011

  3. Outline • Support to activities during the winter shutdown • Radiation measurement campaign (shielding assessment) • Studies for the robots (target handling) replacement project • Conclusions ISOLDE Workshop and Users meeting 2011

  4. Shutdown : Transport of used targets From ISOLDE target area to storage area at CERN • First intervention in the target area (to reduce the dose rate) • Use of “Type A” container for the transport of 24 targets • Average dose rate : 2.18 mSv/h @ 40 cm and 8.1 mSv/h max. • Collective dose of 982 man.mSv for the whole operation • Lessons learnt will be used for transport in 2012 ISOLDE Workshop and Users meeting 2011

  5. Replacement of GPS FE#4 by FE#7 • Replacement of GPS FE (HRS done in 2010) • Very complex interventions involving several groups • Collective dose: 7.6man.mSv ISOLDE Workshop and Users meeting 2011

  6. Front End maintenance Example : Replacement of extraction electrode • Permanent improvement of processes following RP recommendations • Example: development of new tool for extraction electrode replacement • HRS FE#6 maintenance in 2011 : 3.7 man.mSv 1 Sv/h on contact (with b emitters) + very high contamination ISOLDE Workshop and Users meeting 2011

  7. Outline • Support to activities during the winter shutdown • Radiation measurement campaign (shielding assessment) • Studies for the robots (target handling) replacement project • Conclusions ISOLDE Workshop and Users meeting 2011

  8. Shielding efficiency assessment • Motivations: • Linac4 injector for the PS Booster • PS Booster energy from 1.4 GeV to 2 GeV • HIE-ISOLDE project • Can ISOLDE “digest” the energy and intensity increase ? • Extensive radiation measurement campaign performed in 2010-2011 • Shielding performances is one of many RP aspects to address ! ISOLDE Workshop and Users meeting 2011

  9. Original beam parameters for design… Design: 2.2 mA @ 1.0 GeV = 2.2 kW Today : 2 mA @ 1.4 GeV = 2.8 kW Future: 4mA @ 2.0 GeV = 8.0 kW ? ISOLDE Workshop and Users meeting 2011

  10. Measurement and shielding assessment • Measurements in accessible areas outside and inside the hall • Normalization of measured dose rate to the beam intensity • Use of 3D models to reconstruct shielding material thickness Measurement location HRS Beam dump ISOLDE Workshop and Users meeting 2011

  11. Results summary HD target ISOLDE Workshop and Users meeting 2011

  12. FLUKA studies (Y. Romanets – ITN Lisbon) • Comparison measurements calculations • Study of energy increase effect and improvement of the shielding ISOLDE Workshop and Users meeting 2011

  13. Outline • Support to activities during the winter shutdown • Radiation measurement campaign (shielding assessment) • Studies for the robots (target handling) replacement project • Conclusions ISOLDE Workshop and Users meeting 2011

  14. FLUKA study for the new robots project • Current robots used for the target replacement arriving at the end of their lifetime • New concept considered (AGV) • FLUKA calculations needed to assess the robot exposure to radiations • Two concepts have pros / cons ISOLDE Workshop and Users meeting 2011

  15. FLUKA studies : Example UCx on HRS • Dose rate calculations for recovery scenario • Several Sv/h on contact with the target (after 72 h of decay) ISOLDE Workshop and Users meeting 2011

  16. Close view of the residual dose rate • High reliability or remote recovery needed as significant cooling time required before any human intervention ISOLDE Workshop and Users meeting 2011

  17. Robot exposure in parking position • Damage to electronic components in parking position (“currency” is the 1MeV neutron equivalent) • Damage to organic component • Relocate sensitive electronic outside ISOLDE Workshop and Users meeting 2011

  18. Outline • Support to activities during the winter shutdown • Radiation measurement campaign (shielding assessment) • Studies for the robots (target handling) replacement project • Conclusions ISOLDE Workshop and Users meeting 2011

  19. Conclusions • Very busy year to support operation (FE exchange) • Shielding assessment (thanks to extra RP resources available since 2 years) • Baseline for shielding improvement studies • Update of some areas classification • Robot reliability critical considering the future intensity and energy upgrade (several issues with current system this year) for the availability of the facility • Many challenges ahead of us (HIE-ISOLDE) • How can you help us ? ISOLDE Workshop and Users meeting 2011

  20. Your are at home in ISOLDE ! SORT YOUR WASTE AND ADOPT GOOD HOUSEKEEPING PRACTICE !!! ISOLDE Workshop and Users meeting 2011

  21. Your are at home in ISOLDE ! SORT YOUR WASTE AND ADOPT GOOD HOUSEKEEPING PRACTICE !!! IN CASE OF QUESTION: CALL THE A-TEAM ! ISOLDE Workshop and Users meeting 2011

More Related