Bonita School Road Bridge Replacement. Federal Project No. BRLO 5951 (151). September XX, 2013 Applicant: Santa Barbara County Public Works Transportation Division SBCO Flood Control District is the Local sponsor of the Levee project. Project Background Bonita School Road Bridge Replacement.
E N D
Bonita School Road Bridge Replacement Federal Project No. BRLO 5951 (151) September XX, 2013 Applicant: Santa Barbara County Public Works Transportation Division SBCO Flood Control District is the Local sponsor of the Levee project
Project BackgroundBonita School Road Bridge Replacement • Location PROJECT LOCATION To Nipomo Santa Maria River Limits of Levee Soil Cement Reconstruction LEVEE LEVEE N Bonita School Road To Santa Maria To Guadalupe SR 101 SR 166
Project BackgroundBonita School Road Bridge Replacement • Existing conditions 2,000-foot long roadway fill embankment on South end of the crossing LEVEE LEVEE
Project BackgroundBonita School Road Bridge Replacement • Existing conditions 323-foot long bridge constructed of railroad flatcars on North end of the crossing LEVEE LEVEE
Project BackgroundBonita School Road Bridge Replacement • Existing conditions Bridge has been significantly deteriorating since opening in 2002
Project ScopeBonita School Road Bridge Replacement Alternative 1 Alternative 2 Replace existing bridge structure and road fill embankment • Alternative 2: Existing alignment, stage construction • Alternative 1: New alignment, accommodate existing traffic during construction
Flood MapBonita School Road Bridge Replacement SLO COUNTY ZONE X SB COUNTY ZONE A ZONE X LEVEE ZONE A ZONE A ZONE X LEVEE BONITA SCHOOL RD
ApproachBonita School Road Bridge Replacement • Proposed Question Can we replace the existing Bonita School Road Crossing with a bridge structure and road embankment fill, assuming that we meet all Army Corps requirements?