60 likes | 228 Views
Belfast Hotel Project. 141 Bedrooms 15 VRF 3-Pipe Systems 151 Indoor Units Total Installed Capacity – 398 kW Site time – 16 Weeks. Design Stage. Design Calculations - Cymap Indoor Unit Type System Capacities Pipe runs and piping restrictions. Site Drawings.
E N D
Belfast Hotel Project • 141 Bedrooms • 15 VRF 3-Pipe Systems • 151 Indoor Units • Total Installed Capacity – 398 kW • Site time – 16 Weeks
Design Stage • Design Calculations - Cymap • Indoor Unit Type • System Capacities • Pipe runs and piping restrictions
5-Year Peace of Mind Warranty • Design criteria met with regard to horizontal and vertical pipe runs • Validated pressure tests and evacuation procedures • Calculated refrigerant added to system • Detailed commissioning reports by certified engineer returned to Toshiba • Maintenance contract in place with an Accredited Installer • 5-Year parts and labour warranty with manufacturer not contractor