Beyond Waste Plan and P2

Beyond Waste Plan and P2. Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006. Improve P2 Plan Quality. Renew sector expert system and update sectors website Make a set of standard estimates for HS constituent content

wayne-kim
Download Presentation

Beyond Waste Plan and P2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beyond Waste Plan and P2 Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006

  2. Improve P2 Plan Quality • Renew sector expert system and update sectors website • Make a set of standard estimates for HS constituent content • Some facilities have both difficult inventories and attribute low value to inventories, e.g. autobody facilities

  3. Improve P2 Plan Quality • Improve guidance on how to conduct an inventory of hazardous substances • Create automated audits for P2 plans so that most errors are caught before review begins

  4. Lean Manufacturing and Environment • Pilot project funded by EPA PPG grant and BW Pilot Projects • Partnership with Washington Manufacturing Services (WMS) • ECY dovetails environment into WMS’ Lean

  5. Lean Manufacturing and Environment • Objectives • Explore and document how environmental considerations (e.g., risk & waste) add value to Lean Mfg. efforts • Reduce environmental impacts and costs • Promote design of a product / process to reduce toxics • Explore collaboration between Ecology and WMS

  6. Lean & E Pilot Projects • Located in 3 different regions • Two post-pilot workshops • Ross & Assoc. and PPRC are documenting results

  7. Lean & E Design Pilots • Objective • Reduce toxics footprint by re-designing a product or manufacturing process using Lean tools with environmental emphasis • Currently in process • At least one pilot

  8. Contacts • Beyond Waste Plan & Initiatives • Chris Chapman, Contract Manager, 360.407.7160, ccha461@ecy.wa.gov • www.ecy.wa.gov/beyondwaste • Beyond Waste P2 Contracts • Dennis Johnson, 425.649.7040, djoh461@ecy.wa.gov • Lean Manufacturing and Environment • Hugh O’Neill, Project Supervisor, 360.407.6354, hone461@ecy.wa.gov • Margit Bantowsky, Project Manager, 360.407.6353, mban461@ecy.wa.gov