An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kingdom of MoroccoMinistry of Land-Use Management, Water and the Environment Moroccan CDM projects Energy Efficiency projects The First Carbon Exhibition in North Africa and Middle East Region Djerba, 22-24 September 2004 faouzi senhaji GERERE f.senhaji@iav.ac.ma CD4CDM Project

  2. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Moroccan CDM ProjectsEnergy Efficiency Projects Current 7 EE projects (/25)1 PDD Portfolio 1 EE SS project (/9)1 PIN • OCP-Heat Recovery System (HRS) Project 85,000 CER/yr • ONE- Street lighting project (15,000 LCB & PM program) 2,600 CER/yr

  3. OCP-HRS ProjectOffice Chérifien des Phosphateshttp://www.ocpgroup.ma85,000 CER/yrContact p.: Ms. Naima BELKOUCHE-mail:n.belkouch@ocpgroup.ma

  4. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 The Project title: Heat Recovery enhancement at the Jorf Lasfar phosphoric acid production plant • Introduction of two Heat Recovery Systems in the process of sulfuric acid production • The heat recovered allows for increased power generation • This will result in a reduction of the global primary energy consumption

  5. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Inclusionof a HRSin the process… Project summary • Full name :Heat recovery enhancement at Jorf Lasfar PA plant • Location : Jorf Lasfar, 25 km south of El Jadida • Category : Energy Efficiency • Project proponent : Office chérifien des Phosphates (OCP) • PDD : EcoSecurities – CleanTech / Ap • Date of operation : end of 2005 • First year of CER delivery : 2006 • Crediting period : 2006-2015 • Expected CER : 850,000

  6. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 The Jorf Lasfar plant (OCP)Technical description of the project activity • The phosphoric acid process uses phosphates to produce phosphoric acid and fertilizers • The sulphuric acid processing facility uses a MONSANTO process, an exothermic process

  7. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 The Jorf Lasfar plant (OCP)Technical description of the project activity Current use of the heat released from this process: to produce steam / process • 70% recovered & to generate power • 28% in the cooling water (Atlantic ocean) - 2% lost by radiation

  8. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Inclusionof a HRS in the process … Project description • Technical features : • Components to be installed : two heat recovery systems (HRS) • Expected production : 50 t/hr additional sat. steam at 9.5 bars • Additional power capacity : 8 MW • Financial issues : • Total cost of the project : US $ 18.2 million (MAD 200 million) 15.9 installation cost, 2.3 development cost • Timing : • Starting of works : 2005 (1st & 2nd HRS) • Full operation of the two HRS : 2006.

  9. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 OCP-HRS Project Baseline methodology • Methodology : • “Baseline methodology for power generation from enhanced heat recovery following the retrofit of existing industrial processes”(Ecosecurities) ACM 0002 (revised PDD) • Approach : option 48 (a) of the Marrakech Accords • Demonstrate that the project is not BAU • Determine the most likely scenario in absence of the project • Determine the avoided emissions by calculating the Projected Operating Margin: Weighted CEF of the national power plants • Calculations : • Through the crediting period, the CEF moves down from 0.803 (2006) to 0.682 (2009) and then increases to 0.724 (2015) • Over the crediting period, the expected CER are about 850,000

  10. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 OCP-HRS Project Sustainable development • Environmental benefits : • GHG emission free power generation • Reduction of atmospheric pollutants SO2, NOx, CO • Socio-economic benefits : • Improvement of the competitiveness • Net benefits for the country’s economy

  11. 2.ONE-Street lighting project (15,000 LCB program)2,600 CER/yrContacts :Mr. KHATAMI & Mr. TAHIRI E-mail: khatami@one.org.matahiri@one.org.ma

  12. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 ONE-Street lighting SS project Project summary • Full name :Street lighting with LCB & power modulators • Location : different locations • Category : 2-C , EE at the end user • Project promoter :ONE State Utility agency • PIN approved PDD not developed yet • Date of operation : 2005 • First year of CER delivery : 2006 • Crediting period : 2006-2015 • Expected CER : 26,000

  13. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 ONE-Street lighting project Project description • Technical features : • Installed capacity : 3 MW (15,000 x 200 W) • Expected saving : 3 GWh / yr (200 W bulbs to replace 250 W bulbs) • Components : 15,000 LCB of 200 W & PM • Financial issues : • Total cost of the project : US $ 0.5 million (Cost per bulb: US $ 27.3) • Timing : • Starting date : 2005 • Crediting period : 2006-2015

  14. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 ONE-Street lighting project Baseline methodology • Methodology : Described in paragraph 49 of Appendix B of the simplified M&P. • Approach : Displacing Electricity : BAU emissions – project emissions Emissions: Number of devices * power of device * average annual operating hours * emission coefficient (as for 1.D.) / grid loss • Calculations : • Over the crediting period, the expected CER are about 150,000

  15. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 ONE-Street lighting project Sustainable development • Environmental benefits : GHG emission reduction • Socio-economic benefits : • Fossil fuel used in power generation reduced • Promotion of socio-economic activities

  16. For more informations :Permanent Secretariat of CDM National CouncilClimate Change Unit Directorate of Partnership, Communication and Cooperation Ministry of Land-Use Management, Water and the Environment36 Avenue Al Abtal –Rabat –Morocco Tel/Fax : +212 37 68 17 59 Tel/Fax: +212 37 77 47 88rcmdp@mtds.com ucc@mtds.comwww.mdpmaroc.com