EDI Project Task Status Concerns/Issue Questions. Electronic Data Interchange (EDI). Phase I Contract Supported Priority Group I 527D - Receipt/Due Verification 527R – Receipt 856 – Advance Shipment Notice 856S – Shipment Status 861 – Acceptance Status 112 Mils transaction to 5 EDI

wilfred
Download Presentation

Electronic Data Interchange (EDI)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EDI Project Task Status Concerns/Issue Questions Electronic Data Interchange (EDI) Logistics Solutions for the Warfighter

  2. Phase I Contract Supported Priority Group I 527D - Receipt/Due Verification 527R – Receipt 856 – Advance Shipment Notice 856S – Shipment Status 861 – Acceptance Status 112 Mils transaction to 5 EDI Expected Completion May 31 2008 TASK(EDI) Logistics Solutions for the Warfighter

  3. Phase II – IV – to be determined TASK (Cont)EDI Logistics Solutions for the Warfighter

  4. Status Coding 3 of 5 sets completed 2 of 5 set remain at 66% coded Testing Inbound No connectivity to Defense Automated Addressing Service Centers (DAASC) Testing via File Transfer Site with limited input set Outbound Sent test data to DAASC Correcting errors from original transmission STATUS(EDI) Logistics Solutions for the Warfighter

  5. Application Security Plan Gaining Authority to Operate/Connect (ATO/ATC) Awaiting signature from Marine Corps Network Operating Service Center Information Assurance (MCNOSC IA) Performance Based Agreement (PBA) Obtaining signature from LOGCOM Being staffed through LOGCOM Testing Ability to perform end-to-end via approved connectivity Concerns/Issues(EDI) Logistics Solutions for the Warfighter

  6. Questions Questions(EDI) Logistics Solutions for the Warfighter