1 / 9

93rd LHCC Meeting , CERN 7th May 2008

Status of the LHC Project. Lyn Evans. 93rd LHCC Meeting , CERN 7th May 2008. Summary LHC Cryogenics. Cooldown status. Sector 67. Sector 56. Sector 78. Sector 81. Cooldown status. Sector 23. Sector 12. Sector 45. Sector 34. PIM scan in 4-5.

will
Download Presentation

93rd LHCC Meeting , CERN 7th May 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the LHC Project Lyn Evans 93rd LHCC Meeting, CERN 7th May 2008

  2. Summary LHC Cryogenics

  3. Cooldown status Sector 67 Sector 56 Sector 78 Sector 81

  4. Cooldown status Sector 23 Sector 12 Sector 45 Sector 34

  5. PIM scan in 4-5 • After warm-up of Sector 4-5, a ball scan was made to check for damaged PIMs. • In one week, 12 damaged modules were found and replaced.

  6. Ramp of 138 power converters to a current equivalent to 5.3 TeV(including all high current magnets realistic LHC optics ) 19 February 2008,15:00commissioning team

  7. Low-beta squeeze

  8. Re-training of dipoles • The following dipoles have shown re-training: • 3176 • 3180 • 3188 • 3196 • 3362 • 3370 • 3372 • One other dipole (2245) quenched at low field under unclear conditions.

  9. Powering of inner triplet to nominal current 9

More Related