AGENDA • Municipal Electric Utility Overview • Number / size • Local Control • Braintree Electric Business Model • Non-profit • Components of budget • Hedging plan • Potter II repowering project • Anticipated benefits • Obstacles to construct • Schedule
41 Municipal Utilities in Massachusetts Smallest 1MW, Largest 170 MWs 2,886,000 MWH or 13% of total in Mass
BELD Organization • 100 Employees • 63 T&D, Admin • 25 Generation • 12 Broadband • $85 million annual budget • $25 million generation • $60 million T&D, Admin
BELD Business • Vertically Integrated • 385,000 MWH with a peak of approx. 85 MW • Costs broken down into • Distribution • Energy • Transmission • Capacity
BELD Capacity Cost* * If BELD did not have generation
BELD’s Current Capacity Supply • BELD has a diverse capacity supply provided by their assets and contracts. BELD’s total obligation is 112 MWs. • Potter II – 68.6 MWs • Watson 1 & 2 – 31.6 MWs • Seabrook Station – 7.6 MWs • NYPA – 2.0 MWs • Contracted – 15.3 MWs • Total – 125.1* * BELD has surplus capacity and is paid for it by ISO-NE
Potter II Repowering • Commercial Operation since 1977 • Enhanced Maintenance to get us to 2025 • Benefits • Repowered Potter II gives us a hedge against future volatile capacity prices • Efficient generation • Obstacles • Forward Capacity Auction • Construction Risk • Bonding
NEW POWER PLANTSCHEDULE/MILESTONES • Permitting Ongoing Fall 2017 • Forward Capacity Auction Feb 2017 • RFP for gas turbine 2017 • RFP for EPC contractor 2017 • Engineering 2018 • Site prep 2018 • Construction 2019 – June 2020 • Commercial Operation June 2020