APPEARANCE OF THE TANK BEFORE THE COATING. INSTALLATION OF THE SCAFFOLDINGS. INSTALLATION OF COMPRESSOR & PIPPING THE BLASTING POT. PREPARATION,TEST BLASTING FOR PROFILE & CHECK FOR PRESSENCE OF OIL. MATERIALS TO BE USED FOR THE INTERNAL COATING.
E N D
APPEARANCE OF THE TANK BEFORE THE COATING INSTALLATION OF THE SCAFFOLDINGS
INSTALLATION OF COMPRESSOR & PIPPING THE BLASTING POT PREPARATION,TEST BLASTING FOR PROFILE & CHECK FOR PRESSENCE OF OIL
MATERIALS TO BE USED FOR THE INTERNAL COATING CHECKING THE SURFACE TO A WHITE METAL FINISH
CONDUCT CHLORIDE TEST FOR SALT CONTAMINATION TEST RESULT 1PPM (3 PPM IS THE MAXIMUM VALUE)
APPLICATION OF ENECON PUTTY TO THE JOINT & DEEPLY PITTED AREA CONDUCT WET FILM THICKNESS DURING APPLICATION 1ST COURSE COATED WITH ENECON CHEMCLAD SC
2ND COURSE COATED WITH ENECON CHEMCLAD SC APPLICATION FROM 3RD COURSE TO THE TOP AREA, 1ST PART APPLICATION FROM 3RD COURSE TO THE TOP AREA, 2ND PART
APPLICATION FROM 3RD COURSE TO THE TOP AREA, 3RD PART APPLICATION FROM 3RD COURSE TO THE TOP AREA, 4TH PART APPLICATION FROM 3RD COURSE TO THE TOP AREA, 5TH PART
FINISHING OF THE TOP PART OF THE & THE ENTIRE 6 COURSE BLASTING & PAINTING OF THE BOTTOM PART OF THE TANK
AREA BEING REPAIRED A 12X16 HOLE WAS MADE & DAMAGED THE COATING FINAL APPEARANCE OF THE AREA AFTER THE REPAIR WITH ENECON PUTTY & OVERCOAT WITH CHEMCLAD SC
TANK 2 BEFORE ENECON CHEMCLAD SC APPLICATION TANK 2 AFTER ENECON CHEMCLAD SC APPLICATION