1 / 17

Acknowledgements

Design and Tests of a New Rest Gas Ionization Profile Monitor Installed in the SPS as a Prototype for the LHC BIW 04 May 3-6, 2004 –Knoxville, Tennessee C. Fischer, J. Koopman, D. Kramer, R. Perret, M. Sillanoli CERN – Geneva - Switzerland. Acknowledgements. AT/VAC/SL: monitor conditionings

wright
Download Presentation

Acknowledgements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design and Tests of a New Rest Gas Ionization Profile Monitor Installed in the SPS as a Prototype for the LHCBIW04May 3-6, 2004 –Knoxville, TennesseeC. Fischer, J. Koopman, D. Kramer, R. Perret, M. SillanoliCERN – Geneva - Switzerland C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  2. Acknowledgements • AT/VAC/SL:monitor conditionings • ES/MME & PH/TA1:coatings • D. Cornuet and Co.:magnet measurements • G. Arduini:monitor insertion in SPS • A. Beuret:magnet power supplies • A. Guerrero:software requests • B. Dehning, F. Roncarolo: wire scanner data • and all others…. C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  3. Outline • The New Monitor magnet central detector tank and assembly • Commissioning in 2002 • The year 2003 problems & cures results • Preparation & Perspectives for 2004 C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  4. New Rest Gas Monitor • Encouraging results were got since the installation in 1999 of a prototype provided by DESY and modified to use signal from electrons. • It has been decided to equip the LHC with 4 gas monitors (one H, one V, in each ring). • Continuous profile measurements also needed in the SPS for the LHC era. • Prototype design compatible with LHC requirements: transversespace contingencies→compactness impedance budget→ no big discontinuities in the tank smooth transitions, • e- signal → B field required • Conventional magnet found with 200 mm gap, fulfilling space requirements new gas monitor designed accordingly, manufactured in 2001 and installed in the SPS for the 2002 run C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  5. New Rest Gas Monitor: the magnet (1) • magnet recuperated from LEP with following characteristics: Imax = 55 A B max= 0.25 T Strength = 0.14 Tm Gap width : 200 x 200 mm2 Overall length 680 mm section: 681 x 646 mm2 • hole drilled through the yoke for the light signal extraction 3D view 200 mm top view C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  6. New Rest Gas Monitor: the magnet B linearity B (mT) I (A) Relative B variation along z with x=o at different y Relative B variation along z with y=o at different x % % C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  7. New Rest Gas Monitor: mechanical designThe central detector top view light light e- prism 84 mm MCP cross section view 166 mm 3D view C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  8. New Rest Gas Monitor: mechanical designThe tank within its magnet Light signal side view e-signal Light signal F=84 mm 200 mm 3-D view cross section view 680 mm C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  9. New Rest Gas Monitor e_ Electric field map As installed in the SPS with 2 corrector magnets used at - B/2 (3 magnet bump) Picture of the assembled central detector C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  10. Results from commissioning in 2002 encountered problems:high noise level • electron cloudeffect with LHC type beam evidence : signal increase after injection of 3rd batch effect :electrode DC voltage fluctuations →signal fluctuations • high frequency modes generated by the LHC beam structure inside the detector and in cables effect :HV instabilities, signal loss remedies during 2003 stop • NEG application (TiZrV)on HV electrodes to lower SEY • RF absorbers (filters) close to HV supplies • series resistorsclose to detector feed-throughs • view port conducting cover plateinstalled for better image current conduction C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  11. The 2003 campaign (1) encountered problems and cures: • bad electrical contactson phosphor screen after bake-out at 200 C (needed for NEG activation) insertion of thin CuBe frame with flexible contacts • aging of MCP central regiondue to high output signal (test of a fast but less sensitive phosphor) MCP gain decreased and image intensifier added, bump applied to the beam orbit to avoid bad area • limited resolution camera lens diaphragm opening reduced by 50% • lightening on phosphor screen with shortest bunch length series resistors removed • image tilt due to stray B field (through the magnet hole ) on the image intensifier intensifier wrapped with m metal sheets magnet used at 50% of B max C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  12. Results from 2003 (1) LHC type beams from pilot to nominal investigated; dynamic in current 104 Pilot: 5.109 p Nominal: 3.5.1013p • = 0.88 mm 450 GeV • = 0.83 mm E= 450 GeV en=3.5 10-6 m C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  13. Results from 2003: analysis (3) limitations: electron cloud effect still there (from 3rd batch) → signal increase saturation of MCP at 450 GeV Profile Norm evolution along the cycle C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  14. Results from 2003: analysis (4) 75 ns LHC beam: en= 1.4 10-6 m pilot bunch: en= 0.65 10-6 m Limitations, ct’n limited resolution, show-up at 450 GeV for low beam dimensions (s ≤ 0.7 mm) 450 GeV - sthIPM= 0.36 mm smeasIPM = 0.57 mm 26 GeV – sIPM= 1.5 mm Error contribution: 0.35 mm Sources:intensifier residual tilt tails optics: 247 mm /pixel 450 GeV - sthIPM= 0.53 mm smeasIPM = 0.64 mm 26 GeV – sIPM= 2.2 mm C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  15. Cures implemented during the 2004 stop (1) • Electron cloud: MCP input face NEG coated • MCP aging and saturation: MCP replaced by a new one, will be operated at lower gain coupled with Low Light Level camera → lower MCP output current suppression of 2 stage amplification → better S/N ratioand resolution more sensitive phosphor layer on new prism: → lower MCP output current CdS:In →Y3Al5O12:Ce (P46) variable gain to be applied during acceleration cycle → to avoid saturation • Resolution limitation: general cleaning of different detector parts replacement of external RF absorbers close to power supplies number of wires on cathode grid decreased by factor 3 →contribution to tails non reflective treatment of support surfaces →to suppress parasitic reflections new optics in front of the camera→ improved opening C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  16. Cures implemented during the 2004 stop (3) new optical bench PM tube LLL camera C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

  17. Perspectives for 2004 With these improvements and a few other upgrades of the control software, all efforts will made during the year 2004 to bring the monitor to an operational stage for the LHC era. A second monitor working in the H plane is approved and is expected for the 2006 SPS start-up. Thank you for your attention C. Fischer-BIW04-May 3-6, 2004-Knoxville, Tennessee

More Related