CO3 Meeting2014 Start-up Operational Control System Baseline 2014 Start-up planning https://indico.cern.ch/conferenceDisplay.py?confId=286920
Agenda • Foreword (M.Vde) • Operational Control System Baseline • Operating system aspects (V.Baggiolini) • Hardware modules and device drivers (D.Cobas) • Timing system (JC.Bau) • FESA 3 (S.Deghaye) • CMW and RDA 3 (W.Sliwinski) • Controls configuration service (Z.Zaharieva) • LSA and Inca (G.Kruk) • 2014 Planning and Dry Runs (C.Dehavay) • Q&A ACCOR PROJECT – CO3 – M.Vanden Eynden
Foreword • A Long road since 2008 … • 2008 • Purpose, scope and objectives (technical and organizational) • New Front-end Technology : Linux, PCI(e) platform, Intel μp, FMC HW, VME64x crates, COHAL, etc • 2009 • ACCOR Approval by DG: 5 MCHF Budget • Several FC contracts with major European electronics manufacturers • 2009-2013 • Intensive hardware and software development and integration effort in BE-CO and in EQ.GROUPS • Big step forward in Q&A aspects (Asset, MTF, cabling practices, GIS Portal, etc) • 2013 • Massive hardware installation on AD, LINAC2, PSB, CPS • Detailed specification of all renovations prepared by MCCs, OP and EG.GROUPS (EMDS) • Control system baseline (OS, HW, FESA, CMW, CCS, LSA/Inca) • Pilot Dry Runs on AD, LINAC2, PSB • 2014 planning ACCOR PROJECT – CO3 – M.Vanden Eynden
Foreword 2014 : a Key milestone in the Injectors Complex Control System Technology Middleware (CMW) VMEBus PCI(e) PowerPC μP VMEBus64x Controls Configuration DB LynxOS Linux Java Technology GM Software Intel μP FESA 3 Norsk Data Q&A (MTF, …)
Foreword • 2014 • Clear and dedicated Control System commissioning slots in the OP schedule (cfC.Dehavay slides) • All CO experts mobilized during this period • MCCs, Exploitation Manager, ACCOR PL will lead this effort in collaboration with OP and EQ.GROUPS • And the most important: We should consider the Injectors as NEW machines from the control system point of view • End 2014 : end of ACCOR Project ACCOR PROJECT – CO3 – M.Vanden Eynden
Last CO3 : Key dates for 2013 Dec 1st, 2013 OPERATIONAL PLATFORM FIXED & STABLE FOR ACCOR DRY RUNS July 1st, 2013 DEVELOPMENT PLATFORM AVAILABLE & STABLE HW modules, O/S, Device Drivers, FESA, IEPLC Acknowledgements To all BE-CO Project Leaders June’13 : RDA3 JAVA ALPHA Ready BE-CO CONTROL SYSTEM BASELINE April’13 : ALL 32 and 64 bits KERNELS and DEV Tools available July’13 : RDA3 C++ ALPHA Start Integration of RDA3 in FESA, FGC and PVSS Sep’13 : RDA3 C++/JAVA Validated NEW JAPC released Sep’13 : ALL 32 and 64 bits KERNELS STABLE June’13 : critical CO-developed drivers available in SLC6/64 ENCORE available for 32 and 64 bits deployment April’13 : critical CO-developed drivers available for dev in SLC6/64 May’13 : FESA 3.1.0 released for 32 and 64 bits STOP NEW Developments with FESA 2.10 Oct’13 : FESA 3.2 with RDA3 for early developers Dec’13 : FESA 3.2 with RDA3 as main release Feb’13 : FESA 3.0.9 for early developers June’13 : LTIM for FESA3 available Sep’13 : New IEPLC-3 release 2013 CO3, April 24th, 2013 - Marc Vanden Eynden