Status Report MAX-lab. New kappa not yet in operation. Status Report MAX-lab. Status Report MAX-lab. I911-1 Diffraction station Under reconstruction. Status Report MAX-lab. I911-1 Diffraction station Under reconstruction. I911-2 MX station Single-axis goniostat. Status Report MAX-lab.
E N D
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab • New kappa not yet in operation
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-5 MX station Single-axis goniostat New monochromator I911-4 SAXS station Under commissioning
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-3 Tunable MX station Mini-kappa MK3 I911-5 MX station Single-axis goniostat New monochromator I911-4 SAXS station Under commissioning
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-3: Experiment station completely rebuilt March-May 2010 (new hutch, new experiment tables, new goniostat,...) Users during June 2010 Sample changer installation October 2010
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-3: Control software: spec and mxCuBE mini-kappa MK3: not yet used
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab MAX IV New facility replacing the present MAX I, MAX II & MAX III storage rings (and the present FEL test facility) Consisting of: - 1.5 GeV ring (96 m circumference, 6 nm rad) - 3 GeV ring (530 m circumference, 0.3 nm rad, 19 straight sections available) - a short pulse facility that could be extended with a FEL
Kappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab MAX IV Funding available for buildings and accelerator ... but not for the beamlines We hope to have funding for 7 beamlines this autumn including a microfocus MX beamline and possibly ahigh-throughput MX beamline.