An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AUGUST 2009 PRESENT SITUATION OF WATER REGENERATION IN THE VALENCIAN COMMUNITY

  2. INDEX • Territorial framework. • Historic evolution. • EPSAR: Public Organization for Water Sanitation. • The sanitation fee. • Construction of the installations. • Explotation of the installations. • Reuse of treated water. • Economical figures. • Main objectives.

  3. 1 TERRITORIAL FRAMEWORK

  4. 1 TERRITORIAL FRAMEWORK TERRITORIAL FRAMEWORK Poplation 5,8 Mh. Area 23.295 km2. Pluviometry 450 mm. 450 km of coastline. Tourism represents 20% of GDP. Water deficit 350 hm3/a. Castelló VALÈNCIA Alacant

  5. 1 TERRITORIAL FRAMEWORK hm³/a 350 hm³/a Deficit 3.700 170 hm³/a Transfer Tajo-Segura DEMAND 3.700 hm³/a RESOURCES 3.350 hm³/a DEFICIT 350 hm³/a DEMAND RESOURCES

  6. HISTORIC EVOLUTION 2

  7. 2 HISTORIC EVOLUTION • TheValencianCommunitycarriesoutdutieswithregardtowatersanitation and treatmentsincetheyear 1986. RD 1871/85. • In 1986only31% of thepopulationhadwaste-watertreatment. • 70% of theinstallationsdidnotproperlywork. • Betweentheyears1986-1991, thepercentage of populationservedreached66%. • Despitetheefforts, therewas a greatstructuraldeficit. VINARÒS

  8. 2 HISTORIC EVOLUTION • TheValencianCommunitycarriesoutdutieswithregardtowatersanition and treatmentsincetheyear 1986. • RD 1871/85. • Theinfrastructuresexecuteddidnotofferanysecurityregardingtheirsuitablemaintenance. • Tosolvethisneedsthe Cortes Valencianas approvedtheLaw 2/1992. VINARÒS

  9. 2 HISTORIC EVOLUTION • SANITION LAW 2/92 • Intendedtoconsolidatecorrectoperation and maintenance of WWTP, existing and future • Principal functions are: • Guaranteecorrectmaintenance and operation of WWTP • Executeneededsanitationinfrastructures • EstablishSanitationTax • Establishthe EPSAR VINARÒS

  10. EPSAR: PUBLIC ORGANIZATION FOR WATER SANITATION 3

  11. 3 EPSAR: PUBLIC ORGANIZATION FOR WATER SANITATION • FUNCTIONS OF THE SANITATION ORGANIZATION • Collection, managementanddistributionof theSanitationFee. • Execution of theworksforsupply, sanitation and treatmentestablishedbythe Generalitat. • Management of theexploitation of thepublicinstallationsforsanitation and watertreatment. • Collection, management and distribution • of theSanitationFee. VINARÒS

  12. 4 THE SANITATION FEE

  13. 4 THE ICO TAX • EstablishedbytheLaw 2/1992. Itworks as a tax. • Itguaranteestheeconomicalresourcestofinancethemaintenance and operationalcosts of the EDAR (SewageTreatmentPlants). • Itchargestheproduction of sewage, bymeans of theconsumption. • Itaffectsboththeconsumption in publicnets and in theownnets. • There are tworates, onefordomestic use (0,46 €/m3) and onefor industrial use (0,67 €/m3). Itrepresents30% of thewaterinvoice.

  14. 4 THE ICO TAX EVOLUTION OF THE SANITATION FEE

  15. 4 THE ICO TAX ITEMIZATION OF THE WATER INVOICE

  16. 3 EPSAR: PUBLIC ORGANIZATION FOR WATER SANITATION • O • Execution of the works for supply, sanitation and treatment established by the Generalitat. • FUNCTIONS OF THE SANITATION ORGANIZATION • Collection, managementanddistribution of the Sanitation Fee. • Execution of the works for supply, sanitation and treatment established by the Generalitat. • Management of the exploitation of the public installations for sanitation and water treatment.

  17. 5 CONSTRUCTION OF THE INSTALLATIONS

  18. 5 CONSTRUCTION OF THE INSTALLATIONS • I MASTER SANITATION PLAN • Itwasexecutedduringtheyears1993-2000. • Itrepresentedtheconstructionorredesigning of the300 WWTP in townswith more than500 inhab. • Theinvestmentwas533 M€, (338 M€bythe Generalitat).

  19. 5 CONSTRUCTION OF THE INSTALLATIONS INVESTMENTS CONCERNING THE I MASTER SANITATION PLAN 7% 17% 76% STATE GENERALITAT VALENCIANA LOCAL ORGANIZATIONS

  20. 5 CONSTRUCTION OF THE INSTALLATIONS • II MASTER SANITATION PLAN (D197/2003) • Mainlyjustifiedbytwoneeds : • Toadjustthewatertreatmenttothe new legal regulations. • Toadaptthecapacity of treatmenttothecurrent and futuredemands. • The time horizonis2001-2008. • Expectedinvestment of 1.054 M€. Coveredpopulation99,98%. • Investment262 €/he.

  21. 5 CONSTRUCTION OF THE INSTALLATIONS INVERSIONES CORRESPONDIENTES AL II PLAN DIRECTOR DE SANEAMIENTO 7% 8% 10% 55% 20% TOWN COUNCILS USERS STATE GENERALITAT COUNCILS

  22. 5 CONSTRUCTION OF THE INSTALLATIONS EVOLUTION OF THE INVESTMENT IN WWTP CONSTRUCTION

  23. INTRODUCCIÓN 5 CONSTRUCTION OF THE INSTALLATIONS 1993 2008 • WWTP • < 10.000 he • 10.000 – 100.000 he • > 100.000 he

  24. 5 CONSTRUCTION OF THE INSTALLATIONS EVOLUTION OF THE TREATMENT CAPACITY 6.675 4.218 Degree of compliance with the Diractive line 91/271 CEE Served population 96,1% 99,06%

  25. 5 CONSTRUCTION OF THE INSTALLATIONS TREATED LOAD

  26. 3 EPSAR: PUBLIC ORGANIZATION FOR WATER SANITATION • FUNCTIONS OF THE SANITATION ORGANIZATION • Collection, managementanddistributionof theSanitationFee. • Execution of theworksforsupply, sanitation and treatmentestablishedbythe Generalitat. • Management of theexploitation of thepublicinstallationsforsanitation and watertreatment. • Management of the exploitation of the public installations for sanitation and water treatment.

  27. 6 EXPLOITATION OF THE INSTALLATIONS

  28. 6 EXPLOITATION OF THE INSTALLATIONS EVOLUTION OF THE OPERATIONAL COSTS

  29. 6 EXPLOITATION OF THE INSTALLATIONS TREATMENT PLANTS IN SERVICE

  30. 6 EXPLOITATION OF THE INSTALLATIONS TREATED ANNUAL VOLUME ORPESA

  31. 6 EXPLOITATION OF THE INSTALLATIONS PERFORMANCE OF THE ELIMINATION OF BOD5

  32. 6 EXPLOITATION OF THE INSTALLATIONS MUD PRODUCTION CANET

  33. 7 REUSE OF TREATED WATER

  34. 7 REUSE OF TREATED WATER • In the II MasterSanitation Plan, thereuse of waterrepresents 18,2% of theinvestment. • Aspectshavinganinfluenceonthereuse of treatedwater: • Availability of resources. • Degree of quality. • Distancetothepoint of exploitation.

  35. 7 REUSE OF TREATED WATER • 184 hm³/a directlyreused (36%). • Thereuse of treatedwater in theValencianCommunityisone of themostimportant in Spain. • 225 hm³/a reusedaltogether (44%). • At theend of 2010, wewouldbeabletoreuse350 hm³/a (68%).

  36. 7 REUSE OF TREATED WATER WWTP with reuse Nº of WWTP 121 Treatment capacity 464 hm³/a WWTP with tertiary treatment Nº of WWTP 34 Treatment capacity 347 hm³/a WWTP with future tertiari tratment Nº of WWTP 25 Treatment capacity. 3º 111 hm³/a CASTELLÓ DE LA PLANA VALÈNCIA ALACANT