20 likes | 114 Views
I can be found at www.btwholesale.com. Broadband Developments Road Map. Release AJ 16 th September 2013. Release AK 18 th November 2013. IPS, WBC FTTC: Amend order to earlier date / Preponement (BB940-13). IPS, WBC & FTTC: SiM2 (BB1059-13). FTTP: Product Withdrawal (BB940-13).
E N D
I can be found at www.btwholesale.com Broadband Developments Road Map Release AJ 16th September 2013 Release AK 18th November 2013 IPS, WBC FTTC: Amend order to earlier date /Preponement (BB940-13) IPS, WBC & FTTC: SiM2 (BB1059-13) FTTP: Product Withdrawal (BB940-13) FTTC: Improving the transfer and winback process (BB1062-13) WBC: LLU migration to BTW broadband (BB1059-13) IPS, WBC & FTTx: Visibility of Openreach KCI notes via B2B & Portal (BB940-13) CP action needed FTTC: Self Install GEA service test (BB940-13) WBC: Abortive Visit Charges (BB955-13) FTTX: Automated expedite process (BB1059-13) IPS, WBC & FTTX: Visibility of KCI’s via xml & portal (BB1062-13) FTTP On Demand: New Dialogue Service for Distance Based Charging (BB832-13) FTTC: Select OR or CP modem in FTTC PCP only Self Serve Trial (BB832-13) IPS, WBC FTTX: KCI enhancements (BB1062-13) FTTC: Self Install Standard or Flexible Appt for PCP only (BB941-13) FTTC: Consume EMLC speed ranges (BB1062-13) FTTP On Demand: Out of Term EUA charges (BB832-13) FTTP: Product withdrawal (BB1062-13) FTTC: Self Install Openreach to install modem (BB1062-13) FTTC: Consume Openreach TRC charges T2R (BB1059-13) No CP action needed CP Changes recommended FTTC: Self Install ability to select flexible or standard appt (BB1062-13) FTTC: Self Install consume CPE enablement parameter (BB1062-13) FTTP On Demand: New dialogue service for Distance Based Charging (BB1062-13) FTTP On Demand: L2C journey change for Radial Based Charging (BB1062-13)
I can be found at www.btwholesale.com Broadband Release Schedule 2012/13 The above dates are not confirmed until 90 day legal notification has been published