340 likes | 505 Views
Ross Wilson * & Andre Pieters + * BBE Projects + Impala Platinum. Design and construction of surface air cooling and refrigeration installations. Description of refrigeration plant Aspects of construction management Lessons learnt Photographs of other large installations. Impala 16 Shaft.
E N D
Ross Wilson* & Andre Pieters+ * BBE Projects + Impala Platinum Design and construction of surface air cooling and refrigeration installations
Description of refrigeration plant Aspects of construction management Lessons learnt Photographs of other large installations
Impala 16 Shaft Production 257 ktons / month Max depth 1 535 m VRT 57 °C Current maximum duty 31.5 MW (R)
Surface BAC and refrigeration systems TO SHAFT AMBIENT AIR BAC CHILLER[S] CCT
Sprays Fans Water chillers Condenser cooling towers Continue
Construction management • EPCM • Turnkey
Construction project EPCM Option Turnkey Option • Partial EPCM • Client places orders • Client manages site Full EPCM Design & Build Design, Build & Operate Variations of EPCM Variations of Turnkey RISK Client High Turnkey Contractor High
Schedule EPCM Concept or pre-feasibility Feasibility study CBE study [detailed design & costing] Project Implementation
Schedule EPCM Concept or pre-feasibility Feasibility study CBE study [detailed design & costing] Project Implementation TURNKEY Concept or pre-feasibility Feasibility study Time Saving Tender and contract Project Implementation
Detailed design and client approval Civil works Manufacture of equipment Mechanical installation Electrical and instrumentation Commissioning Implementation - the real schedule Detailed design and client approval Civil works Manufacture of equipment Mechanical installation Electrical and instrumentation Commissioning
SAFETY • Mindset • Training • Induction • Communication • Task Observations • Risk Management • Risk Assessment • Risk Controls • Inspections • 4 Corrective actions • Review • Incident Investigations • Accident/Incident Review • SHEMS Review • Performance Review • Control Systems • Policy, standards, procedures. • Contractor Control • Incident monitoring • Document control
Conclusions • With Turnkey projects, risk shifts to contracting company • Whether Turnkey or EPCM mining company retains ultimate control over design aspects, sub-contractors, risk assessments, etc • With many mines in the USA approaching the threshold where refrigeration is required, the experience of the many South African mines who have installed refrigeration plants can be called on
From concept…… Amandelbult No.2 Shaft
..… to completion Amandelbult No.2 Shaft
Impala No.11C Shaft, 13 MW Impala No.14B Shaft, 14 MW
Impala No.11C Shaft, 13 MW Impala No.14B Shaft, 14 MW