An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Americas Aerospace Quality GroupAAQG Project Management Project #54 AIR5359 Update Team Reported by: Vince May Date of Report: 2006-09-13

  2. AIR5359 Re-Write Team Team Members

  3. P#54 – AIR5359 Update Team Vince MayMike Roberts 2005-06-07 3 • AIR5359 contains “shalls” therefore it should be an AS (Standard) • Need for implementation of AS9104 in the Americas’ Sector • Develop a comparison matrix between AS9104 and AIR5359 • Draft AS9014 • Perform gap analysis of AS9014 vs. FAA 8120.12 and C.I. 21-011 • Submit to SAE for 2 week review • Submit for balloting • Release AS9014 • Requirements for AS vs. AIR were not clearly understood • Release of AS9104 by the IAQG caused a re-write of AIR5359 • Successful ballot in the Americas • Change AIR5359 to AS9014 • Integrate AIR5359 and AS9104 requirements into a AS9014 as a single document • 100% Project Milestones • Meeting Attendance

  4. P#54 – AIR5359 Update Team Vince May G Y R G 2006-03-08 2006-09-13 Mike Roberts • Description of Project • Update AIR5359 to AS9014 • Benefit of project • Americas Sector compliance to AS9104 • Drafted AS9014 • Performed Gap Analysis of AS9014 vs. FAA 8120.12 • Updated AS9014 to Fill Identified Gaps • Submitted to SAE for Comments • Updated AS9014 to Resolve Issues from SAE Comments dispositioned by the RMC • Submitted to SAE for balloting • Resolved comments from balloting • Released AS9014 – June 2006 • Incorporated Approval of Auditor Authentication Bodies • Removed RMC Approval of Trainers • Added definition of Auditor Authentication Body from the AIR5493 Re-Write Team • Removed FAA 8120.12 requirement for suppliers and CRBs to notify the PAH when a supplier fails an initial registration audit • * See additional issues/decisions in Additional Information Section • Determine implementation date

  5. Milestones

  6. Additional information • Continued use of AAs in the Americas scheme • Document only addresses IAQG/AAQG members responsibilities but does not preclude others from using the ICOP process • Added requirement that, at a minimum, certificates be in English • Removed allowance of auditors to perform 4 assessments while pending RMC approval • Replace the term “aerospace” industry with “aviation, space and defense”, where possible • Comments concerning changes to the main body of AS9104 will be passed on to Mike Roberts to forward to the AS9104 Re-Write Team • Need SAE or other assistance in assuring document meets the SAE Style Guide upon release

  7. Additional information (Continued) • Incorporated Approval of Auditor Authentication Bodies • Removed RMC Approval of Trainers • Added definition of Auditor Authentication Body from the AIR5493 Re-Write Team • Added definition of “some” aerospace experience for AS9100 AEA as 2 in the last 15 years • For certificates issued in the Americas,AS9104 latest revision and the CRB is accredited under the aerospace Registration Management program.