Open AMI Network. 10/22/08. Standards Overview. AMI-SEC. Utility Systems. Meter-Specific Networks. Data Collection Systems. HAN. Wide Area Networks. MDM System. Network Operations 61968-3. OMS 61968-3. Data Collection 61968-9. MDM Or MDUS 61968-9. Open HAN 1.0. GIS
E N D
Open AMI Network 10/22/08
Standards Overview AMI-SEC Utility Systems Meter-Specific Networks Data Collection Systems HAN Wide Area Networks MDM System Network Operations 61968-3 OMS 61968-3 Data Collection 61968-9 MDM Or MDUS 61968-9 Open HAN 1.0 GIS 61968-4 Planning & Scheduling 61968-5 Control & Configuration 61968-9 MDM 61968-9 AMI Network ??? WMS 61968-6 Load Mgmt. 61968-9 Load Control 61968-9 MDUS 61968-9 Meter Data & Comm. C12.19 C12.22 CIS 61968-8 Meter Maintenance 61968-9 AMI-SEC
Consumers Energy’s Service Territory • 1.8 Million Electric Meters • 1.6 Million Gas Meters • 1 Million gas meters in non Consumers Energy’s service territory
AMI – Observations • Differences between systems • Proprietary Communication Technology • System logging and auditing • Device registration – device dependant • Collector • Meter • Substation metering • Other (smart grid devices, etc) • Network management interfaces • Outage reporting • Troubleshooting • Monitoring performance • System configuration and upgrades
AMI – Observations (Cont.) • AMI communication vendors are not interoperable for maintenance and management • Meter • Collector/Access Point/Mesh Gate/Take out point/Cell Relay/Tower Gateway Base Station/ Base Station • HAN ESP interface managed and implemented different between vendors
AMI-Network TF Proposal • Define the devices and well defined points of interoperability within the AMI network for maintenance • Define the benefits of interoperability between AMI network maintenance components to utilities • Sharing backhauls • Gas AMR meters • Water AMR meters • Hybrid AMI systems • Point to Point and mesh and PLC
Proposed TF Scope • Evaluate existing Maintenance Use Cases • Define New Maintenance Use Cases • Define System Functional Requirements for AMI meters to the AMI head end for maintenance/lifecycle purposes • Identify areas within an AMI network that are viable for maintenance interoperability • Scope is outside of OpenHAN and the Zigbee/Homeplug efforts • Input from the Group???
Evaluate Existing Use Cases • SCE use cases • S1 AMI system recovers after power outage, communications or equipment failure • U1 Utility installs, provisions and configures AMI system • U2 Utility manages end-to-end life-cycle of the meter system • U3 Utility upgrades AMI system to address future requirements • Other Utility use cases • AMI Vendor use cases
Define New Use Cases • Focus on maintenance life cycle related activities for the meter thru the head end system • Avoid HAN use cases with the exception of the AMI Communication interface with the ESP • IP/3rd party gateways
Functional Requirements • Create a SRS (system requirements specification) similar to OpenHAN’s efforts • Derive requirements from the use case review • Focus on the AMI head end to the meter from a network maintenance perspective • Input from the group???
Schedule • Meet via teleconference every 3 weeks • Meet at every UCA face to face meeting Questions/Comments? Next Steps?