The Bison Pipeline Project

The Bison Pipeline Project. • Open Season planned for 2 nd Quarter of 2004 • Proposed Interconnects -Deadhorse (Bighorn, Fort Union) -MIGC, Thunder Creek • Deliveries into Northern Border at CS 6 • MAOP @ 1435 lbs • 275 to 300 Pipeline Miles • Negotiated Rate: 25 cents

yaholo
Download Presentation

The Bison Pipeline Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Bison Pipeline Project • • Open Season planned for 2nd Quarter of 2004 • • Proposed Interconnects • -Deadhorse (Bighorn, Fort Union) • -MIGC, Thunder Creek • • Deliveries into Northern Border at CS 6 • • MAOP @ 1435 lbs • • 275 to 300 Pipeline Miles • • Negotiated Rate: 25 cents • • Recourse Rate: 29 cents • • In-Service – November, 2006 Bear Paw Big Horn Northern Border NBPL Compressor Stations Fort Union Bison

  2. Powder River Basin Outlook • We believe the PRB can reach sustainable production levels of 1.5 to 2.0 Bcfd assuming normalized netbacks and annual connected new wells in the 2,000 range • Bison can meet near and long-term needs of the Powder River Basin • - Less than 2 Bcfd, a 24” Bison system is required • - Greater than 2 Bcfd, a 30” Bison system is required

  3. Netbacks to Powder River BasinFrom Market Centers January 2004 Vent. vs. Greens Cheyenne Chicago $5.00 Cheyenne $4.80 $4.76 $4.68 $4.67 $4.60 $4.47 $4.00 NBPL/Ventura $3.00 ANR/Greensburg NGPL/Greensburg $2.00 NBPL/Chicago $1.00 Adv/Chicago $0.00

  4. Bison Project Overview Strategic Advantages for Wyoming PRB • Provide an economical rational netback by building an interstate pipeline to the heart of the Basin • Provides the best netback versus alternate projects and existing outlets • Leverages Northern Border markets that are highly correlated to NYMEX • Leverages Northern Border existing infrastructure of available capacity and the optionality of economic expandability • Northeastern route provides market & pricing diversification to southern routes and balances the PRB pipeline grid • Minimal impact on market prices due to displacement

  5. Summary • PRB has not met expectations • Federal Permitting Process • Regulatory Uncertainty • Still Bullish on the Powder • 39 Tcf technically recoverable • Est. 39,000 more wells to be drilled • We believe the PRB can reach sustainable production levels of 1.5 to 2.0 Bcfd • Open Season is planned in the 2nd Quarter in 2004

  6. Bison Contacts • Dick Shepherd 402-492-7431 • richard.shepherd@nborder.com