Predicting new double-stack operations in a naturally ventilated tunnel

Predicting new double-stack operations in a naturally ventilated tunnel. Presented by: Justin Edenbaum Co-author: Not listed. Agenda. Diesels in tunnels Notched Tunnel Relative Analysis Results Conclusions. Diesels in tunnels. Diesel locomotives outside. Diesels in tunnels.

yama
Download Presentation

Predicting new double-stack operations in a naturally ventilated tunnel

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Predicting new double-stack operations in a naturally ventilated tunnel Presented by: Justin Edenbaum Co-author: Not listed

  2. Agenda Diesels in tunnels Notched Tunnel Relative Analysis Results Conclusions

  3. Diesels in tunnels • Diesel locomotives outside

  4. Diesels in tunnels • Diesel locomotives in tunnels

  5. Diesels in tunnels • Diesel locomotives in tunnels • Relative airflow

  6. Diesels in tunnels Diesel locomotives in tunnels Relative airflow Next locomotives

  7. Diesels in tunnels Diesel locomotives in tunnels Relative airflow Next locomotives Decrease in performance

  8. Naturally ventilated tunnels Train performance in tunnel

  9. Agenda Diesels in tunnels Notched Tunnel Relative Analysis Results Conclusions

  10. Notched tunnel California Nevada • A Tunnel • Location (map) • 3,460 meters long (~2 miles) • 1.65% uphill grade East to West

  11. Notched tunnel

  12. Notched tunnel • Double stack operations • Notch roof

  13. Agenda Diesels in tunnels Notched Tunnel Relative Analysis Results Conclusions

  14. Relative analysis • Worse-case, grain train • Length ~2km (1.2 miles) • Lead, mid, end consist (3x3x1) • Minimum entering speed 19.3 kph (12mph)

  15. Relative analysis • Double stack, design case • Length ~4km (2.5 mile) • Lead, mid consist • Simulated speed 24 km (15 mph)

  16. Relative analysis • Subway Environment Simulation (SES) • SES 2000 • One Dimensional Analysis • Aerodynamic and thermodynamic • Freight rail projects • Moffat • Mount Shaughnessy • Mount Macdonald/Rogers Pass • Mullan • Stampede Pass

  17. Relative analysis Simulation

  18. Agenda Diesels in tunnels Notched Tunnel Relative Analysis Results Conclusions

  19. Results

  20. Results • Compared to grain train at 12 mph: • Double stack at 15 mph • Relative airflow less • 3D effects unknown • All other factors better • Double stack at 17.5 mph • All factors better

  21. Agenda • Diesels in tunnels • Notched Tunnel • Relative Analysis • Results • Conclusions • Case study: Monitor speeds less 17.5 mph • Consider tunnel operations