An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Based Management Udaya Gamage 15th November 2012

  2. Assignment 1 • Provide the following (no mark sheet is required) • Cover sheet (showing student details, etc) • Title or name of project • Brief background of the project (100 words approximately) • Explanation of the project status. • Is the project completed? • Is it under way? • Or is it yet to start?

  3. This is important in terms of your critical analysis in assignments 2 and 3 (50 words) • Justification of why the selected project is suitable for analysis of the topics in assignments 2 and 3 (50 words approximately) • Confirmation that you have a PMP available for analysis in assignment 3.

  4. Assignment 2 • Topic: The Project Business Case • Word Length – 2500 approximately • The cover or title page should have the following • Title • author • date • student number • Executive summary • 100 -200 words (does not form the part of assignment count) • Why the report was prepared • How it is structured • what are the important findings • conclusions and recommendations

  5. Assignment 2 • Table of contents (respective page numbers of) • executive summary • Introduction • Main sections • References • Individual appendices • Figures and tables • Introduction • 100 Words • Why the report has been prepared • What project is being analyzed • How the report is structured

  6. Assignment 2 • Project Background • 100 words approximately • Brief background of the project context • Business case (should provide) • Justification for undertaking a project • Evaluating the benefits, cost and risk of alternative options and the rationale for the preferred solution

  7. Provide a critical analysis of the business case for your chosen project to cover the points below. • In what ways does your project conform (or not) to the definition of a project in the literature? • Who (or what) is the ‘sponsor’ of your project? • To what extent was a ‘business case’ created for this project (or should have been)? • In what ways are the benefits, cost and risk evaluated as part of the business case (or should have been)? • In what way/s is the preferred solution justified (or should have been)? • In what way is management commitment and approval for the investment obtained (or should have been)?

  8. Assignment 2 • Conclusions • 150 words approximately • Lessons learned • What findings are important for the management in future projects • What represent a threat to project success • Recommendations • 150 words approximately • How your project (or similar future projects) should be managed in light of what you have learned from your analysis.

  9. Assignment 2 • List of references – (using the Harvard AGPS system) • There should be at least 15 references • Use the e-Journals and eBooks available from the library website • Appendices • Turnitin Originality Report

  10. Assignment 3 • Topic: The Project Management Plan • Word Length 3000 – 4000 approximately • Consists of two parts • body of the assignment and is a critical analysis of the chosen PMP • Appendix 1 which should be a practical Project Management Plan • The cover or title page should have the following • Title • author • date • student number

  11. Assignment 3 • Part 1: Critical Analysis of the Project Management Plan • Executive summary • 200 -250 words (does not form the part of assignment count) • Why the report was prepared • How it is structured • what are the important findings • conclusions and recommendations

  12. Assignment 3 • Table of contents (respective page numbers of) • executive summary • Introduction • Main sections • References • Individual appendices • Figures and tables • Introduction • 250 Words • Why the report has been prepared • What project is being analyzed • How the report is structured

  13. Assignment 3 • Project Background • 250 words approximately • Brief background of the project context • Structure and the contents of the PMP • 1000 – 1500 approximately • Provide a critical analysis of who is intended to be the main audience of the PM plan? • What do they need to know? • How will they use the plan? • What information needs to be provided? • How should that information be provided? • In what sequence? • What does the theory say? • What alternatives exist for the structure of a PM plan (examine and compare a range of theories and opinions here)?

  14. Assignment 3 • Provide a critical analysis of how the PM plan has been structured relative to what theory suggests • Justify why the respective components have been included or explain why it should have been structured differently. • Contents of the PMP • 1000 – 1500 words • Why has a project schedule been included? • Is it a meaningful document • Was it prepared by the right people, does it contain the right information, etc.?

  15. Assignment 3 • Conclusions • 250 words approximately • Summarize your findings from the analysis of your project management plan • What did you find out about the project plan? • Does it conform to the recognized theory? • What aspects are important and are of significance to project outcomes? • What are its strengths and its weaknesses?

  16. Assignment 3 • Recommendations • 250 words approximately • What are your recommendations flowing from this analysis with regard to the PMP? • What changes should be made to the PMP for this project (or similar future projects)? • Address the shortcomings identified in the conclusions • focus on recommendations related to the PMP and not on the project itself. • List of references • Appendices

  17. Assignment 3 • Part 2: Appendix 1 – The PMP • Should include the following • project background, including an overview, brief description and a statement of objectives of the project • a summary of the management approach to be taken, who will manage the project, to whom do they report, how will project governance be achieved, etc. • detailed sections on the various aspects of the project that need to be managed (scope, time, cost, etc.) • additional information or documents to support the above • Turnitin Originality Report

  18. What is a project? • Unique • Novel • Transient • How do you differentiate this with normal business? • delivering objectives with constraints of time, cost, and quality • What is a temporary organization in PM? Ex. of supertanker and flotilla of Yachts • How can we categorize projects? Runners, Repeaters, Strangers, and aliens

  19. What is the difference between the outcome/output of a project and the desired performance improvement? Ex, of A bridge across the Yangtze river • What do you think about the owner contractor model in a project?

  20. Core functions of PM (+ 2, risk and commitment of stakeholders need to be managed)

  21. Study table 1.2 of turner for tools and techniques of PM • Scope managed thro’ product breakdown structure • Organization managed thro’ organization breakdown structure • Quality managed thro’ control techniques • Cost is managed thro’ cost breakdown structure • Time managed thro, networks and bar charts (CPA, CPM, and PERT)

  22. Management of the project • second dimension of the structured approach • The project life cycle (stages thro’ vision to reality)) • The management process (management of stages • Five steps of the cycle • Concept • Feasibility • Design • Execution • Close-out • Management process is derived from the ten step problem solving cycle (refer table 1.4 and figure 1.6)

  23. The management process (each stage of the PM to be executed)

  24. Project Management is Fractal management, Discuss? • The levels, third and final dimension • the integrative level, (project definition report, functional design, and flow chart) • The strategic and administrative level (milestones, responsibilities, and the system design) • The tactical or operational level ( activity schedule, responsibility chart, and detailed design) • Read on project management as sailing a Yacht • Micro-level • Macro-level

  25. Objectives • Define the steps and processes necessary to move the project forward from a conceptual idea to a meaningful change management project • Develop an initial project charter for sponsor decision-making so that more detailed investigations can be undertaken • Develop business cases necessary to ensure the project is consistent with the sponsor’s objectives and goals • Define the scope and nature of the proposed project to allow more detailed planning to take place for sponsor commitment.

  26. Figure 3.1: Project management process interactions (Source: PMI 2008, p. 42)

  27. The project charter • The three Ws – why, what and when • The three Hs – how much, hazards and how • The four Cs – critical success factors, communication plan, collection of knowledge and commitment.

  28. The business case • What the project is • Why it should be done • What options have been considered? • How much will it cost? • How will it be done? • What are the risks?

  29. Gambles (2009) provides some clear guidelines on the purpose of a business case and how to go about it. • Confirm that the business case is robust – that is, in principle it meets business need, is affordable, achievable, with appropriate options explored and likely to achieve value for money. • Establish that the feasibility study has been completed satisfactorily and that there is a preferred way forward • Ensure that there is internal and external authority, if required, and support for the project.

  30. Establish that quality plans for the project and its products are in place

  31. Ensure that the major risks have been identified and outline risk management plans have been developed. • Establish that the project is likely to deliver its business goals and that it supports wider business change, where applicable. • Confirm that the scope and requirements specifications are realistic, clear and unambiguous. • Ensure that the full scale, intended outcomes, timescales and impact of relevant external issues have been considered. • Ensure that there are plans for the next stage. • Confirm planning assumptions and that the project team can deliver the next stage. • Confirm that overarching and internal business and technical strategies have been taken into account.

  32. Stephen Wearne’s life cycle for industrial projects • Several versions of the project life cycle set the project within the life cycle of the product • Refer fig. 11.1 and table 11.1 project life cycle used by the World Bank • Harold Kerzner • Proposes a model addressing the life cycle of the product produced by the new asset – classical marketing view • Refer fig. 11.2