1 / 8

DRAFT AD electricity costs and subsidy requirements

DRAFT AD electricity costs and subsidy requirements. Notes. We have made these broad cost estimates based on existing data and feedback from members

yanka
Download Presentation

DRAFT AD electricity costs and subsidy requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DRAFT AD electricity costs and subsidy requirements

  2. Notes • We have made these broad cost estimates based on existing data and feedback from members • The AD sector is a varied sector encompassing many different models: each plant built to date has followed quite specific models – therefore caution must be exercised in using this data other than for the purpose of calculating the average cost of electricity generation from AD and the subsidy required per MWh • Results are presented in £/ MWh of subsidy required (this can be converted into pence per kWh: for example £50/ MWh is 5 p/ kWh)

  3. Assumptions

  4. Results (16% project IRR pre-tax)

More Related