530 likes | 647 Views
Science park Waterschei: Energyville & EIT KIC Energy: InnoEnergy. Overall OBJECTIVE. Establish Research Center for Advanced Energy Technology in Flanders that belongs to top 10 energy research & innovation institutions in Europe by 2015 and top 5 by 2020.
E N D
Science park Waterschei:Energyville&EIT KIC Energy:InnoEnergy /
Overall OBJECTIVE Establish Research Center for Advanced Energy Technology in Flanders that belongs to top 10 energy research & innovation institutions in Europe by 2015 and top 5 by 2020 /
General Context 1. EU Energy Policy
General ContextMedium Term EU Energy Policy Primary Energy Sources Regulation of Monopolies Reliability and Quality Innovation and Competitiveness Internal Market Security of Supply Capacity Low Prices And Efficiency Lisbon Agenda Environment Climate Change Kyoto and Post-Kyoto Nature Preservation
General ContextEU Energy Policy Need fertile ground for energy revolution EU Strategic Energy Technology (SET) plan 2020 targets (20-20-20)
EU 20-20-20 targetsby 2020 Reduction of greenhouse gases Energy consumption, Efficiency increase Share of renewable energy 100% -20% -20% +20% 8,5%
General ContextLong Term Climate Change Challenges Annual energy related CO2 worldwide emissions 450 ppm scenario Need paradigm shiftfor energy provision IEA WEO 2009
General ContextEU Energy Policy Need fertile ground for energy revolution EU Strategic Energy Technology (SET) plan 2020 targets (20-20-20) 2050 vision (reduction CO2 by > 85%)
General ContextNew Energy System Required Completely different system by 2050-…: Maybe H2 as partly energy carrier (?) Maybe 2-nd & 3-rd gen biofuels successful (?) Maybe new synthetic liquid fuels from CO2 capture by means of solar light (?) But certainly more diverse end-energy conversion; more electrified; much more integrated interconnections & grids ever more important!
EU SET Planhttp://ec.europa.eu/energy/technology/set_plan/set_plan_en.htm
General Context • SET plan relies on two important pillars • EERA (European Energy Research laboratories) • EII (European Industrial Initiatives) /
General ContextSET - EERA http://www.eera-set.eu/home
General Context SET - European Energy Research Alliance Belgium / Flanders absent! Must join forces – Need critical mass • Joint energy research programs supporting SET-plan • Strength partner = crucial for participation • Working groups a.o.: electric power storage transportation & networks solar photovoltaic transmission and distribution network for the future wind energy • 10 founding partners: • CEA (Frankrijk) • CIEMAT (Spanje) • CRES (Griekenland) • ECN (Nederland) • ENEA (Italië) • Helmholz Association (Duitsland) • LNEG (Portugal) • Riso – DTU (Denemarken) • UK-ERC (VK) • VTT (Finland) /
Research Evolution industrial relevance Research, Development & Demonstration Concerto, … DSO demo’s Research & development EIE, Ind. Init. IWT projecten Applied Research FP7-8-… SBO, IWT grants Fundamental Research JRC FWO, GOA… time /
Research Evolution Deployment industrial relevance Research, Development & Demonstration Concerto, … DSO demo’s Research & development EIE, Ind. Init. IWT projecten Applied Research FP7-8-… SBO, IWT grants Fundamental Research JRC FWO, GOA… time /
General ContextSET - European Industrial Initiatives • Initiative from Industry • Large-scale pilot plojects + technological innovatio • 7 initiatives: wind, solar, bio-energy, CCS, electricity grid, smart cities, sustainable nuclear energy • Theme “smart” explicit in min. 4 themes • Theme smart cities important part • Theme green cars: grids essential /
General Context 2. VITO and KULeuven Limburg
General ContextRelocation VITO En Tech & LL axis • VITOsearches relocation & expansion of activities; Mol remains core but some activities elsewhere • KULeuven wishes to develop axis Limburg/Leuven; reflects already for long time on a spin-off/technology park in Limburg /
General ContextRelocation VITO En Tech & LL axis GAF(KHLim, Xios, UHasselt, KULeuven) looks for convenient location to collaborate Association KULeuven may lead to further opportunities for energy research /
General Context 3. EIT KIC Energy & InnoEnergy
General ContextEIT KIC Energy & InnoEnergy Launched by EU Commission President Barosso http://eit.europa.eu/
General ContextEIT KIC Energy & InnoEnergy A new collaboration model promoting cross-national, cross-sectoral and cross-disciplinary approaches to knowledge sharing and transfer for excellence in innovation. For the first time, Higher Education will interact on an equal footing with other partners. Integrating the “knowledge triangle”
General ContextEIT KIC Energy & InnoEnergy KIC = Knowledge & Innovation Community
General ContextEIT KIC Energy & InnoEnergy What is a KIC? is a high-profile, collaborative consortium a “legally and financially structured and managed entity” of geographically distributed but thematically convergent stakeholders open to international participation will become a world leader in its field encompassing the whole innovation chain from education to economic impact will deliver a measurable impacts on society economic, scientific, educational and entrepreneurial will have a minimum life of 7 years
General ContextEIT KIC Energy & InnoEnergy Size and lifetime of a KIC 50-100 M Euro total spending per year Life 7-15 years Funding : EIT 25%, fully committed, subject to evaluation of milestone delivery Others 75% (leverage factor 3), for example : European programmes European Structural Funds National and regional funding Industry investment (including in-kind contributions) EIT Foundation (also seed funding, scholarships…) Private investors & Venture Capitalists Investment banks
General ContextEIT KIC Energy & InnoEnergy Ingredients for a KIC with impact Geographically distributed people across the European Community and linking to centers of excellence in other parts of the world Working in networks focussed on typically 4 – 6 major nodes which are “co-location centers”, where staff from different stakeholders come to work together, face-to-face and which link other partners, such as local clusters of SMEs Each co-location center should encompass a significant part of the innovation chain Co-location of people is critical it is the key to achieving knowledge transfer and ‘translation’ between stakeholders and between science, research and business effective translation is fundamental to delivery of KIC goals Mobility of people is therefore a pre-condition
General ContextEIT KIC Energy & InnoEnergy Original idea was to enter the EIT KIC competition with ELAt ELAt = TUEindhoven, KULeuven & RWTH Aachen triangle But Aachen pulled out Waterschei/Genk in the middle of the triangle
EIT KIC Energy & InnoEnergyhttp://www.innoenergy-initiative.com/
EIT KIC Energy & InnoEnergy See movie Inno_Energy_IIa.wmv
EIT KIC Energy & InnoEnergy Co-location center Eindhoven/Leuven has been attributed subject area of “Intelligent Energy Efficient Buildings & Cities” /
EIT KIC Energy & InnoEnergy“Intelligent Energy Efficient Buildings & Cities” Integration of distributed generation of electricity and heat/cold Focus on simultaneous interactions between buildings, energy conversion systems and grids (esp electric grids, but also heat/cold networks, natural gas, CO2,…) “Intelligent” = “smart” = clever control strategies and control possibilities from distance (ICT applications) /
EIT KIC Energy & InnoEnergy“Intelligent Energy Efficient Buildings & Cities” CHP / Cogeneration
EIT KIC Energy & InnoEnergy“Intelligent Energy Efficient Buildings & Cities”
EIT KIC Energy & InnoEnergy“Intelligent Energy Efficient Buildings & Cities”
EIT KIC Energy & InnoEnergy“Intelligent Energy Efficient Buildings & Cities”
General Context 4. Concrete circumstances a. Running projects in Flanders b. EU SET plan initiatives and funds
Concrete circumstancesRunning projects Flanders “Generaties” Initiative by Flemish Government • Intelligent grids • Wind Energy • VFI (Vlaams Fotovoltaïsch Initiatief) • Bio-fuel /
Smart Grids • R&D-partners: • Work out concrete concepts whereby energy demand & supply are alligned intelligently, taking into account: • Flexibility of customers • Flexibility of local producers in combination with storage systems • Network issues • Communication aspects • Integration of energy demand for mobility • Possible control strategies • E-market • Realisation of large scale pilot project and simulation VPP /
VSGP (Vlaams Smart Grid Platform) • TIS-proposal submitted • Objective /
Concrete circumstancesEU initiatives and funds EEGI: 2 G€ Other areas: together 8 à 9 G€ By 2020 Financiering: - 7th and 8th R&D framework program - CO2 emission certificates: European pre-allowance: 300 million EUAs Flanders wishes “unfair share of the deal” /
Concrete circumstancesEU initiatives and funds Smart grids platform /
Concrete implementation 5. Waterschei physical implementation
Waterschei physical implementation Stad Genk (spin-offs) KUL Vito EIT VSGP GAF /
Offices building 2 • Chairs: 200 • Meeting rooms: 6 • 2 x 50 people • 2 x 35 people • 2 x 8 people • Auditorium 120 people /
Infrastructure building 2 Matrix set up experimental components connected by smart grids Nutsaansluitingnaarkelder & centralecontroleruimte /
Infrastructure building 2 • Specific laboratories • Controle space smart grid • Lighting (perhaps appliances) • Storage (electric - batteries & heat) • Hybrid drive train • Thermotechnical lab • Climate room • Supporting services: • Mechanical workshop • Workshop ultracap or other • Workshop EMC & power quality • Storage / warehouse • Workshop electricity - electronics • Whemical workshop • Calibration room /