NENO IMG NANC Report. July 17, 2002. NENO Status. Draft 8 of NENO Report Executive Summary required Sections 7.1 requires table Templates of each optimization measure 90% complete Input from NANPA on impact analysis and NANP Exhaust estimate. NENO Status. Final NENO Report

yestin
Download Presentation

NENO IMG NANC Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NENO IMG NANC Report July 17, 2002

  2. NENO Status • Draft 8 of NENO Report • Executive Summary required • Sections 7.1 requires table • Templates of each optimization measure 90% complete • Input from NANPA on impact analysis and NANP Exhaust estimate

  3. NENO Status • Final NENO Report • Planned release for September NANC • NENO Report will include Templates

  4. Face-to-face meetings • Conference Call: • July 25 11:00 a.m. - 1:00 p.m. EDT • Face-to-face: • August 20 & 21 • Location: TBD