HEAD SLUICE 2.00 mt X 1.2 mt. Left Earth Dam 522 Mt. 31.5 Km. LEFT MAIN CANAL. RESERVOIR. SEEPAPALLY VAGU. SPILLWAY ( 77 mt). Right Earth Dam226 Mt. Non EPC Package Works under progress. EPC Package Works under progress. Project cost : 100.52 cr Ayacut : 23086 ac.
E N D
HEAD SLUICE 2.00 mt X 1.2 mt Left Earth Dam 522 Mt 31.5 Km LEFT MAIN CANAL RESERVOIR SEEPAPALLY VAGU SPILLWAY ( 77 mt) Right Earth Dam226 Mt Non EPC Package Works under progress EPC Package Works under progress Project cost : 100.52 cr Ayacut : 23086 ac BHUPATIPALEM RESERVOIR PROJECT