1 / 8

Hospital PPPs State of Mexico IFC Transaction Experience

Hospital PPPs State of Mexico IFC Transaction Experience. The Location: Estado de México. One of 32 states in Mexico Population 14.4 million. The Client: ISSEMyM. IFC Mandate .

york
Download Presentation

Hospital PPPs State of Mexico IFC Transaction Experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hospital PPPsState of Mexico IFC Transaction Experience

  2. The Location: Estado de México • One of 32 states in Mexico • Population 14.4 million

  3. The Client: ISSEMyM IFC Mandate Initially IFC was hired to implement PPPs for a newly-opened oncology center and for construction/operation of a new tertiary hospital IFC analysis showed Oncology center could be optimized by contracting w/ other insurers for utilization, without need for a PPP No need for proposed tertiary hospital Need for two new 120-bed secondary hospitals – via PPPs • State social security agency for state employees • Health insurance and services for approx 900,000 people (employees + families) • Network of 82 primary care centers, 10 secondary hospitals, 4 tertiary hospitals

  4. PPP Transactions Project • New 120 bed regional secondary hospitals in Toluca and Tlalnepantla • Estimated investment of $48 million (Toluca) and $57 million (Tlalne) Structure • Operator is responsible for design, construction, financing, equipping, facility management, non-clinical services, and selected clinical services (dialysis, labs, imaging) under a 25 year contract • The public sector will be responsible for hospital management & other clinical services • The private sector operator will receive a fixed payment and a variable payment related to performance • PPP operator assumes risk for: • Cost of consumables • Replacement of medical equipment

  5. Bidding • Sequential bids for Toluca (Sept/10) and Tlalnepantla (Oct/10) • Three-step bidding evaluation Must exceed thresholds Pass/fail vis-à-vis Lowest wins functional specs • Toluca bid: • 3 bidders (all passed) • Prodelmex won • Tlalnepantla • 4 bidders (3 passed) • Marhnos won Concept Design Financial Bid (PPP payment) Technical & Financial Criteria

  6. Hospital Concept Designs

  7. Implementation Issues State’s PPP law requires EACH project to be approved by State Legislature. 12-month delay in submitting to Legislature Tlalnepantla location hampered by limited space and existence of clinic & communications tower Design changes & obligation to include new clinic Bidders reluctant to take consumables & equipment replacement risk Risk transferred but mitigated with caps

  8. Project Selection & Justification Investor Confidence IFC’s Value Added IFC’s presence • enhanced bidding competition • gave confidence to operators re: bankability/ sustainability • Recommended different projects • Sizing to meet client needs & fiscal limits • Reports to State Legislature Bidding Procedures • Simplified bid criteria & evaluation • Recommended max price to client

More Related