RENEWABLE ENERGY ACTION PLAN IN WEST NUSA TENGGARA PROVINCE

RENEWABLE ENERGY ACTION PLAN IN WEST NUSA TENGGARA PROVINCE. Semarang , 11 th July 2011. Renewable Energy For Productivity and Added Value. NATIONAL ENERGY POLICY. REGIONAL ENERGY POLICY. * For electricity generation. RENEWABLE ENERGY UTILIZATION Current Condition.

yoshi
Download Presentation

RENEWABLE ENERGY ACTION PLAN IN WEST NUSA TENGGARA PROVINCE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RENEWABLE ENERGYACTION PLANIN WEST NUSA TENGGARA PROVINCE Semarang, 11thJuly 2011 Renewable Energy For Productivity and Added Value

  2. NATIONAL ENERGY POLICY

  3. REGIONAL ENERGY POLICY * For electricity generation

  4. RENEWABLE ENERGY UTILIZATION Current Condition

  5. RE POTENTIAL AND IT’S UTILIZATION

  6. RE DEVELOPMENT OPPORTUNITIES

  7. RE UTILIZATION PROJECTION Note. Value are accumulative of the previous year

  8. NEW ENERGY MIX TARGET

  9. RE ACTION PLAN Minihydro Power Plant Note. The value are accumulative every 5 years

  10. Microhydro Power Plant Note. The value are accumulative every 5 years

  11. Solar Home System Note. The value are accumulative every 5 years

  12. Centralized PV Note. The value are accumulative every 5 years

  13. Biogas Note. The value are accumulative every 5 years

  14. Wind Power Plant Geothermal Power Plant Note. The value are accumulative every 5 years

  15. Biomass Power Plant Note. The value are accumulative every 5 years

  16. IMPLEMENTATION STRATEGY • Establish and carry out a forum consist of related institution responsible for RE implementation; • Formulate and implement funding sheme; • Increasing the quality of human resources and technology; • Formulate the detail of implementation plan.

  17. Regional Energy Forum (FORKENDA) 1. RE INSTITUTION SET UP RE Dev’t Team • Minihydro • Microhydro • Biofuel • Biomassa • Geothermal • Biogas • Solar 1. There are 2 (two) teams have been established, both team responsible for the development of microhydro and biofuel in West Nusa Tenggara Province; 2. The problem is, starting from 2011, each dinas budget based on target, so it would be difficult to ask another dinas to lead a team which goal is for RE development, because it is not their target/responsibility.

  18. 2. FUNDING SCHEME Note. Rate interest = 12 %

  19. 3. HUMAN RESOURCES AND TECHNOLOGY • Increase human resources competency by following training and short course in the field of renewable energy; • Join cooperation with institutions to conduct research in the field of renewable energy; • Provide community development funds to educate people who lived surround RE project area.

  20. 4. DETAIL IMPLEMENTATION PLAN • Identification of village and sub village which are have not been electrified; • Collecting data and information about RE potential, for instance microhydro, hydro power plant, wind power etc; • Conduct feasibility study and detail design engineering on potential locations; • Increasing the local content of RE technology; • Creating healthy and safe climate of investment; • Implementation of feed in tariff.

  21. THANK YOU VERY MUCH FOR YOUR ATTENTION Renewable Energy for Productivity and Added Value Powerpoint Templates