230 likes | 453 Views
RENEWABLE ENERGY ACTION PLAN IN WEST NUSA TENGGARA PROVINCE. Semarang , 11 th July 2011. Renewable Energy For Productivity and Added Value. NATIONAL ENERGY POLICY. REGIONAL ENERGY POLICY. * For electricity generation. RENEWABLE ENERGY UTILIZATION Current Condition.
E N D
RENEWABLE ENERGYACTION PLANIN WEST NUSA TENGGARA PROVINCE Semarang, 11thJuly 2011 Renewable Energy For Productivity and Added Value
REGIONAL ENERGY POLICY * For electricity generation
RE UTILIZATION PROJECTION Note. Value are accumulative of the previous year
RE ACTION PLAN Minihydro Power Plant Note. The value are accumulative every 5 years
Microhydro Power Plant Note. The value are accumulative every 5 years
Solar Home System Note. The value are accumulative every 5 years
Centralized PV Note. The value are accumulative every 5 years
Biogas Note. The value are accumulative every 5 years
Wind Power Plant Geothermal Power Plant Note. The value are accumulative every 5 years
Biomass Power Plant Note. The value are accumulative every 5 years
IMPLEMENTATION STRATEGY • Establish and carry out a forum consist of related institution responsible for RE implementation; • Formulate and implement funding sheme; • Increasing the quality of human resources and technology; • Formulate the detail of implementation plan.
Regional Energy Forum (FORKENDA) 1. RE INSTITUTION SET UP RE Dev’t Team • Minihydro • Microhydro • Biofuel • Biomassa • Geothermal • Biogas • Solar 1. There are 2 (two) teams have been established, both team responsible for the development of microhydro and biofuel in West Nusa Tenggara Province; 2. The problem is, starting from 2011, each dinas budget based on target, so it would be difficult to ask another dinas to lead a team which goal is for RE development, because it is not their target/responsibility.
2. FUNDING SCHEME Note. Rate interest = 12 %
3. HUMAN RESOURCES AND TECHNOLOGY • Increase human resources competency by following training and short course in the field of renewable energy; • Join cooperation with institutions to conduct research in the field of renewable energy; • Provide community development funds to educate people who lived surround RE project area.
4. DETAIL IMPLEMENTATION PLAN • Identification of village and sub village which are have not been electrified; • Collecting data and information about RE potential, for instance microhydro, hydro power plant, wind power etc; • Conduct feasibility study and detail design engineering on potential locations; • Increasing the local content of RE technology; • Creating healthy and safe climate of investment; • Implementation of feed in tariff.
THANK YOU VERY MUCH FOR YOUR ATTENTION Renewable Energy for Productivity and Added Value Powerpoint Templates