An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Retail Rates Update WIEG Board MeetingMay 6, 2010 Presented by: Kavita Maini, Principal KM Energy Consulting, LLC

  2. Main Objective • Interest in new We Energies, WPL rates? • Other rate design ideas?

  3. Economic Development Rates • Approved in 2010 • WPL’s Experimental Economic Development Program Rider • WEPCO Charter Steel • Main reason: Significant demand destruction

  4. WPL’s Experimental Economic Development Program Rider • Eligibility • Applicable to load expansions and attracting new load in service area; could also apply to existing load that is at risk of leaving the state (PSCW approval needed for this instance) • Must meet several pre-conditions to qualify • Rate • Floor: 105% of marginal costs • Ceiling: Existing Applicable Tariff • Declining discount phased to applicable tariff over 5 years

  5. WPL’s Experimental Economic Development Program Rider Open Meeting Oral Decisions • Commission denied WPL’s deferral accounting treatment • Existing customers are unaffected in between rate cases • During a rate case, increased sales will help spread costs over larger MWh volumes • Two year experiment

  6. WEPCO’s Charter Steel Contract • Filed on Feb 18, 2010 and Commission Order on May 3, 2010 • Two part real time pricing rate design • Existing load under existing rate that is a combination of firm and non firm (Cp-FN) • Incremental load under day ahead LMPs +20% • Incremental load based on comparison with threshold load shapes developed using Nov08-Oct09 • Incremental load on day ahead LMPs not subject to demand charges, fuel adjustment, point beach credits

  7. WEPCO’s Charter Steel Contract • If Curtailment initiated, incremental load must comply • Charter Steel contract expires Dec 31, 2011 • WEPCO proposed a 30 day cancellation provision at any time • Can switch back all load to existing rate after contract expiration

  8. WEPCO’s Charter Steel Contract Commission issued Order on May 3rd • Customer must receive market benefits and take market risks – Lower energy prices allow for benefits; change cancellation provision to require Charter Steel to a minimum of 1 year contract term for balancing market risk and removing what it considered to be a “hold harmless” clause • Utility Shareholders and utility customers will not be harmed – Defer portion of WEPCO revenues associated with incremental usage in 2011 to match up with costs that will be known in 2012 for 2011 (transmission costs) • Charter incremental usage and costs to be deducted from Fuel Rules Calculations to avoid double counting

  9. Real Time Pricing Variants • WEPCO Charter Steel – Could be considered three tiered with firm, interruptible and increments @ LMP although firm and interruptible portion form the threshold load shapes • WEPCO Approach (existing RTP rate) – Two Tier with a Customer Baseline tied to firm service and deviations to be settled @ LMP plus adders; WEPCO is open to introducing an interruptible component • WPSC Approach (subject to change) – Also two tier though firm portion tied to existing rate and non firm @ LMP plus adders