1 / 32

DET Future Projects

DET Future Projects. Major DET Projects Coming. Network Improvements With SOD, implement Sniffer/IDS (Intrusion Detection System) Systems on all networks Implementation of Archive II data Improvements to CTE (Content Transformation Engine) Automatic PDA/Cell Phone Pages

yves
Download Presentation

DET Future Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DET Future Projects

  2. Major DET Projects Coming • Network Improvements • With SOD, implement Sniffer/IDS (Intrusion Detection System) Systems on all networks • Implementation of Archive II data • Improvements to CTE (Content Transformation Engine) • Automatic PDA/Cell Phone Pages • Improved Web Server Performance and Security • Redundant backup, Zero Downtime, Regional/National Backup

  3. Major DET Projects Coming • New Development Web Server • Implementation of FX-Net Server for IMET support • Implementation of GIS/IMS Servers • Implementation of Gridded Forecast at a Glance • New Radar Generation (Version 2) – Located at SRH

  4. Major DET Projects Coming • New Backend Server Process and Hardware (Cluster) • New SR Intranet (BMX has the Lead) • BMX is taking the lead on the following: (See Ken Graham) • The Future is Now • The Future is Near • Any Other projects that are needed or required to support your Office

  5. Climate Services Victor Murphy Chief

  6. Motivation NOAA Strategic Plan 2 of the 4 objectives involve an active role in Climate Services Increased media and public interests More exposure in coverage of El Nino/La Nina Global warming issues Climate change and variability Climate Services

  7. Climate Services Regional Steering Committee Tasked to Establish the general direction for the Climate Services Program Met in Baton Rouge August 2003 Interacted with WSH, NCDC, SRCC, State Climatologists (TX, LA, OK, FL) NWS Regional and Local Climate Services Implementation Plan Signed off on August 29, 2003 Climate Services

  8. Hydrologic Services Vision

  9. Hydrologic Products and Services • Current • AHPS web page implementation • Extend river forecasts from three to five days on AHPS web pages. • Future • Flood watch product enhancements (format, updates) • Implement AHPS basic services at over 200 service locations • Conduct AHPS educational outreach workshops at WFOs • Conduct AHPS customer service workshops • Conduct hydrologic customer service workshops • Conduct RFC/WFO workshops at the RFCs • Streamline suite of WFO hydrologic text products (i.e., Outlook,Watch, Warning,Advisory) using VTEC/segmentation • Implement WFO flood warning verification system • Implement WARNGEN template for dambreak-related FFWs • Enhancements to AHPS web page

  10. Hydrometeorological Operations • Current • Provide teletraining on FFMP application • Future • Collaborations between RFCs and WFOs • MPE training for WFOs by RFC personnel • data QC (ongoing), site-specific model (ongoing) MPE, dambreak scenario, RFC contingency forecast, information sharing • Automated hydrologic database sharing from WFO to RFC • Automated hydrologic database sharing between WFOs to support WFO hydrologic service backup • Automated hydrologic database sharing from RFC to WFO • DAMCAT, simplified DAMBREAK model training during RFC/WFO workshops. • Regional supplements for the hydrologic services program

  11. AHPSAdvanced Hydrologic Prediction Services • Current Status • National Implementation • National PNS • Revise Charter • Develop National AHPS page URL Kandis Boyd Hydrologic Services Program Manager

  12. AHPSAdvanced Hydrologic Prediction Services Future Enhancements • Develop more user-friendly interface • Incorporate User Feedback • Include Recommendations from the APIT report • Expanding AHPS core suite of graphical hydrologic products Kandis Boyd Hydrologic Services Program Manager

  13. TADDTurn Around Don’t Drown TM • Current Status • Continue to Market TADD • Develop Partnerships • Enhance Outreach Materials • Expand Web Page (Personal Success Stories) • Partnering with TX DOT to produce road signs Kandis Boyd Hydrologic Services Program Manager

  14. TADDTurn Around Don’t Drown TM Future Enhancements • National Campaign • TADD Success Stories • Incorporate User Feedback • Secure ongoing National Funding Kandis Boyd Hydrologic Services Program Manager

  15. WIRE WEIGHTS • Current Status • Focus on Primary Wire Weight Site Locations • Identify Alternate Means of Measurement (Clinometers) • Install Staff Gages Kandis Boyd Hydrologic Services Program Manager

  16. WIRE WEIGHTS Future Enhancements • Complete Staff Gage Installation at Primary Locations • Investigate Installing Automated Gages • Identify Alternative Means of Measurement for Secondary and Tertiary Sites Kandis Boyd Hydrologic Services Program Manager

  17. Meteorological Services 2004

  18. Public/Marine Program Transition to Modernized PILs Time: Present to Summer 2005 Goal: By Customer Request, Convert the CCCNNNXXX of our WMO Headers to modernized PILs

  19. Public/Marine Program Service Change Notices Time: Jan 2004 Goal: Provide more lead time in PNS's for product changes, per the request of our customers

  20. Public/Marine Program User Defined Grid-based Forecasts On The Web Time: Implement in 2004 Goal: All WFOs providing grid-based forecasts for our customers, including meteorograms.

  21. Regional Operations Center Refine Operations Time: FY2004 Goal: Complete ROC redesign. Refine support to WFOs, partners, and customers

  22. Verification Polygon Warning Verification Time: FY2004 Goal: Devise a new scoring system that evaluates the quality of the warning

  23. Verification IFPS Grid Verification Time: FY2004 Goal: Increase CWA border verification through use of COOP & supplementary obs.

  24. Aviation TAF Skill Improvement Time: Continuous Goal: TAF CIG/VIS POD & FAR Exceed GPRA

  25. Aviation – CWSU Redefined Services to ARTCC & TRACONs Time: JAN 2006 Goal: Provide 50 mile radius forecasts for major HUBs

  26. Aviation IMETs Time: JUN 2006 Goal: TAG Team IMETs to increase SR deployability

  27. NWR and Dissemination Future NWR Expansion NWS Coverage Goals • Full Coverage of High Risk Areas • 95 Percent of State Population Coverage NWR O&M Costs • Projected to exceed FY04 budget by $379K • Deficit will grow to $2.24M by FY09

  28. Future NWR Expansion NWR and Dissemination

  29. WCM Program Watch-By-County (WBC) Process Time: Jan 2005 Goal: Improve Watch/Collaboration Process

  30. WCM Program StormReady Recognition Requirements Time: Ongoing Goal: Effectively Manage Program Growth

  31. WCM Program Gridded Wind Field for TC Winds Time: Tropical Season Goal: Improve NHC Spatial/Time Guidance

  32. WCM Program Impact Statements Time: 2004-05 Winter Season Goal: Improve Customer Response to WSW

More Related