6 TH ANNUAL CONFERENCE

6 TH ANNUAL CONFERENCE. Performance Based Maintenance Results. Tim Lattner, P.E. Director, Office of Maintenance , Florida Department of Transportation. Florida State Roadways. Performance Based Contracts. Asset Maintenance Contracts Focused Performance Contracts

Download Presentation

6 TH ANNUAL CONFERENCE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 6TH ANNUAL CONFERENCE

  2. Performance Based Maintenance Results Tim Lattner, P.E.Director, Office of Maintenance, Florida Department of Transportation

  3. Florida State Roadways

  4. Performance Based Contracts • Asset Maintenance Contracts • Focused Performance Contracts • Lighting; Striping; Pond Maintenance; Sidewalk; Aesthetics • Memorandums of Agreement • Lighting; Signals; Landscaping

  5. Management Approach for Performance Based contracts • Do not provide “to do” or “work needs” lists or “deficiency survey” results • We cannot direct them on what to do • Things may not be corrected as quickly as you like • We may not be have the same ability to respond to “high profile” complaints • Need to hold them to the performance measures in the contract

  6. Expect Contractors on Performance Based contracts to: • Determine what needs to be done • Meet performance measures by performing consistent maintenance • Take full responsibility • Take pride in the condition of “their” assets

  7. Key Elements to Measuring results of Performance Based contracts • Cost comparison • MRP results • Contract performance results (AMPER)

  8. FY 2012/2013 Expenditures

  9. Performance Based Striping contracts

  10. Maintenance Rating Program Results • Statewide MRP for FY 13-14 • 86 • Statewide MRP for FY 13-14 for AM areas (not apples to apples comparison) • 87

  11. Asset Maintenance Contractor Performance Evaluation Report AMPER

  12. AMPER • Asset Maintenance Contractor Performance Evaluation Report • Grades contractor performance using a standard, established, thorough process • Generates a numeric 0-100 score with 70 being threshold of acceptable performance • Results are used for matters of Default, Non-Responsibility and Contractor selection for future jobs

  13. Contractor Performance

  14. AM Program Growth

  15. Questions?