An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introducing New Technology for Operation& Maintenance of Sewage Treatment Plant (STP)

  2. SEWAGE TREATMENT PLANT OPERATION Air Blower HL HL ML Aeration Tank Settling Tank Primary Collection Tank ML LL LL

  3. Filtering process PUMP Treated Water PUMP Dozingpump Chlorine & Acid HL ML HL Settling Tank ML LL LL

  4. Present Problems & Solutions • Very low Life span of Filters ( viz. Carbon & Sand) due to the following reasons • Improper performance of the system due to Manual Operations • Sewage water is used for Back washing of Filters • Filters Back washing not performing at right intervals • Solutions for improving Life span of Filters ( viz. Carbon & Sand) • Fully automatic Operation by introducing PLC system instead of Manual operation • Fresh / Treated water is used for Back washing of Filters • Filters Back washing performed at right intervals by using Programmed Logic • Control System

  5. Present Problems & Solutions There is no provision for alarms during any deviations in the process Required alarms at right time can be provided by using PLC system Examples: • Pump motors Fail to start • Pump Motors dry run • Water Tanks over flow

  6. Advantages of renovating the existing plant By using alterant Solutions • Trouble free operation • Maximum utilization of Spares • On time annunciation during process deviation • Fully automated operation • No labor requirement for operation. Only supervision is needed • Annunciation panel can be fixed at any desired point

  7. Advantages of renovating the existing plant By using alterant Solutions • 7. If alarms conditions are not returned within a specified time second stage alarms can be provided at a different location. • Effective maintenance & on time support • One year warranty for the equipments used for renovation • Annual Maintenance Contract facility is available.

  8. An alternative solution at affordable price with attractive features for more details log on www.alterant.in email -: support@alterant.in